FSR CB-22+ Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor FSR CB-22+ (2 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 2 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
CB22+ Installation Instructions
LIT188543466
Structural Channel
Route conduit (supplied by customer)
to knockouts as required
Structural Member
supplied by customer
All mounting hardware
ONLY
AC Access Plate
AC POWER INPUT WIRING MUST
BE PERFORMED BY A QUALIFIED
ELECTRICIAN
4x #8-32 x 1/4" Long
Pan Head Screw
Turn latch to open door
Shelf
Drop Ceiling Material
(supplied by customer)
b
a
18-3/4" x 22-1/2"
4x Capture Tab
Cables support the Ceiling Box, and are NOT
door up towards ceiling and (b) push towards shelf -
INTENDED FOR USE WITH COMMON "T" GRID
tabs over ceiling panel to hold in place.
Model Number CB-MNT1
completely remove door. Installation of 18-3/4" x 22-1/2"
Door Removal:
building codes. Install safety cable as required by local building
DROP CEILING AND IS NOT COMPATIBLE
gross weight. Use appropriate mounting methods based on local
after AC wiring is complete.
NOTE:
WITH ALL DROP CEILINGS.
1.
(Alternate Method 2)
3.
required by building codes.
safety cables.
codes. Route conduits to box as required.
drop ceiling material into door can be done as required,
while door is off or during re-assembly. Bend capture
Install CB-22+ to a structural ceiling able to support 5x the noted
Mounting:
reverse procedure to install. Disconnect safety cable to
2.
Quick 3/32" Cable Installation KIt (sold seperately)
NOTE: Ceiling Box suspension method
(Shown) Threaded steel rod (1/4"-20 minimum) is
required for applications where the pole is
supporting more than 50lbs. and is recommended
for all ceiling box installations to minimize fixture
movement.
(Alternate Method 1)
12 ga. steel wire may be used (supplied by
customer) at 70,000 psi tensile strength or better as
Turn latch to open door (unlock if needed). (a) Push
To install AC main power into unit, remove AC access
plate by removing 4x #8-32 screws, as shown. Wiring
must be performed by a qualified electrician only.
Wiring must be done in accordance with all NEC and
other applicable codes. Re-install AC access plate
AC Wiring:
make electrical connections as required.
supports.
Clip Removal (cable not shown - reverse steps to install)
Shelf Removal (reverse steps to install)
Mounting Brackets as shown. Install rack unit and
reinstall shelf into Ceiling Box. Make electrical
4b.
Remove shelf to mount electronics. Use existing
connections as required.
holes/slot pattern adding additional holes if required
to adequately secure equipment. Reinstall shelf and
MAXIMUM DISTRIBUTED LOAD - 40LBS
To install 2RU rack-sized equipment, install 2RU
4.
4a.
To access shelf and equipment, retract
hinges located under the shelf on the side
you wish to rotate down. Support the shelf
until the cables engage it.
To fully remove the shelf, remove the two
#6-32 screws on the sides that retain the
cable clip. Slide the clips out of the shelf.
The shelf should hang on the two remaining
spring hinges. Carefully retract the final two
spring hinges while fully supporting shelf as it
rotates out of the Ceiling Box.
For shelf installation, the arrows on the shelf
must point away from the receptacles at
the back of the box and towards the door
latch at the front. Fully retract 2 hinges on
the rear of the shelf and lift shelf into Ceiling
Box. Align both pins with the Ceiling Box
embosses located on either side of chassis.
Insert point side of the cable clips into the
side of the shelf, rotate until the end of the
clip passes through the shelf, then slide clip
back. Install the two #6-32 screws through
the shelf side into the clips. Fully retract the
remaining 2 hinges on the front of the shelf
and rotate shelf into Ceiling Box engaging
the hinge pins in the front embosses.
The shelf may be flipped over and mounted
to the top of the Ceiling Box using the same
spring hinge operation. In this position the
cables will not function as rotational
Shelf Options and Operation: Direction Arrow
Direction Arrow
Alternate 2RU Mounting Location
4x #10-32 x 3/8" Long
Pan Head Screw
Shelf Front
Preinstalled 2RU
Bracket Location
Shelf disconnected
from Ceiling Box
Shelf disconnected
from Cable
as Shelf arrows
Shelf
point in same direction
2x Screw to
remove/attach
Arrow shaped Clip to


Product specificaties

Merk: FSR
Categorie: Niet gecategoriseerd
Model: CB-22+

Heb je hulp nodig?

Als je hulp nodig hebt met FSR CB-22+ stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd FSR

FSR

FSR CB-22+ Handleiding

27 Januari 2025

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd