Vango Zeya DLX 500 Handleiding

Vango Tent Zeya DLX 500

Lees hieronder de 📖 handleiding in het Nederlandse voor Vango Zeya DLX 500 (1 pagina's) in de categorie Tent. Deze handleiding was nuttig voor 13 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/1
IF YOU HAVE ANY PROBLEMS PLEASE CONTACT YOUR LOCAL RETAILER or
AMG Group Ltd., Kelburn Business Park, Port Glasgow, Scotland. PA14 6TD.
UK Consumer Hotline: 0844 811 0535 E-Mail: info@vango.co.uk
Calls to our Customer Hotline cost 5p per minute. Calls from mobile phones, cable networks or public payphones will generally cost more.
FLYSHEET FIRST PITCHING
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Assemble the poles and lay them parallel on the
ground.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Open out flysheet and position in required direction.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Insert the poles through the pole sleeves on the
outside of the flysheet matching the colour of the
middle pole section to the coloured tab at the pole
sleeve end.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Locate one end of each pole on one side of flysheet,
into the Ring & Pin system at the base of the tent.
Make sure poles locate into correct pin system (all
poles follow corresponding flysheet seams to pin
system).
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Push poles into an arch from opposite ends and locate
pole ends into corresponding metal pin.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Tighten the tension adjusters located on the Ring & Pin
webbing.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Start pegging out the main corners at one end of the
tent using the pin pegs provided.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Pull the tent forward until taut and peg out the main
corners at the other end of the tent, again with the pin
pegs.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Ensure the tent is in a straight line.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Secure the tent using the pin pegs through the Ring &
Pin system (see fig 2).
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Peg out ALL guy lines, ensuring that they are in line
with the pole or seam they are attached to.
INNER ATTACHMENT
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Suspend the inner by attaching toggles on
the inner tent through rings on the inside of
the flysheet. Do the rear first and work
towards the front of the tent.
ï‚·
ï‚·
ï‚·
ï‚·ï‚· Once fully attached, the inner can be left in
when pitching or striking the tent. However,
it is advisable to remove the inner when
striking the tent when wet.
TENSION BAND SYSTEM
1. Remove Tension Band System from pockets
and attach into the corresponding clips at
the apex of the pole. Adjust the straps until
they are taut.
2. DO NOT OVER TENSION. Excess tension will
alter the shape of the tent.
3. Tension bands are designed to stabilise the
tunnel structure of the tent. The bands are
not required to be used in calm weather.
Figure 1.
Figure 2.
Tent Pitching Instructions Zeya DLX 500 –
Ring & Pin System
1. Locate one end of each pole onto the corresponding metal pin. The metal pin inserts into the hollow
metal ferrule on the end of each pole. (See Figure 1). Push the pole into a curve from the opposite
side, one at a time, and locate all pole ends onto the metal pins.
2. Peg the corners of the tent through the metal rings using pin-pegs. It is important to drive the peg
into the ground at a 45 degree angle to obtain the best grip. (See Figure 2).


Product specificaties

Merk: Vango
Categorie: Tent
Model: Zeya DLX 500

Heb je hulp nodig?

Als je hulp nodig hebt met Vango Zeya DLX 500 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Tent Vango

Handleiding Tent

Nieuwste handleidingen voor Tent