Installation and Assembly:
Wind Rated Concrete Ceiling Tilt Mount for 32" - 65" Outdoor
Flat Panel Displays
Models: ECMU-01-C, ECMU-01-C-S, ECMU-02-C, ECMU-02-C-S
ECMU-03-C, ECMU-03-C-S, ECMU-04-C, ECMU-04-C-S
ISSUED: 06-22-10 SHEET #: 061-9054-6 01-15-11
Max UL Load Capacity: 200 lb (90.7 kg)
Max Wind Rating: 90 mph, elevation 200 ft, Category D
©
UL
USC
2 of 32 ISSUED: 06-22-10 SHEET #: 061-9054-6 01-15-11
NOTE: Read entire instruction sheet before you start installation and assembly.
Tools Needed for Assembly
• phillips screwdriver, 3/16" allen wrench
• drill
• 3/8" (10 mm) drill bit
• level
• Do not begin to install your Peerless product until you have read and understood the instructions and warnings
contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, for US
customers please call Peerless customer care at 1-800-865-2112, for all international customers, please contact
your local distributor.
• This product should only be installed by someone of good mechanical aptitude, has experience with basic building
construction, and fully understands these instructions.
• Due to outdoor environmental conditions such as strong wind gusts, heavy snow, hail, rain, etc. The environmental
enclosure, together with its mount, extension tube and hardware, must be inspected at least once a year, and
immediately following any time winds exceed 90 mph. A qualifi ed installer or inspector must check for signs of rust,
loose fasteners, bent metal, etc. If evidence of excessive wear, deterioration or any unsafe condition is observed,
this product must be taken out of service immediately. Direct all inquiries to customer care if you have any
questions.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Never exceed the Maximum UL Load Capacity. See page one.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws fi rmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding
power.
• This product was designed for use with other outdoor products only.
• This product was designed to be installed on the following wall construction only;
WALL CONSTRUCTION HARDWARE REQUIRED
• Solid Concrete Included
• Other or unsure? Contact Qualifi ed Professional
WARNING
Table of Contents
Parts List.................................................................................................................................................................................3
Installation to Solid Concrete Surface ....................................................................................................................................4
Installing Tilt Brackets .............................................................................................................................................................6
Mounting and Removing Flat Panel Screen ...........................................................................................................................7
3 of 32 ISSUED: 06-22-10 SHEET #: 061-9054-6 01-15-11
ECMU-01-C
ECMU-02-C
ECMU-03-C
ECMU-04-C
ECMU-01-C-S
ECMU-02-C-S
ECMU-03-C-S
ECMU-04-C-S
Description Qty. Part # Part # Model # Part #
A
ceiling plate 1 061-T1306 061-7306 ECMU-01-C 061-T1266
Bsupport column 1 see chart see chart ECMU-01-C-S 061-7266
Cconcrete expansion anchor 8 5M9-381-H03 5M9-381-H03 ECMU-02-C 061-T1267
Dadapter box 1 061-T1264 061-7264 ECMU-02-C-S 061-7267
E5/16"-18 x 1" socket screw 4 520-5035 520-5035 ECMU-03-C 061-T1268
F7/16" x 4" hex head bolt 3 520-5014 520-5014 ECMU-03-C-S 061-7268
G7/16" nylock nut 3 530-5003 530-5003 ECMU-04-C 061-T1269
Hadapter plate 1 061-T125
8
061-725
8
ECMU-04-C-S 061-726
9
I1/4-20 x .75" socket screw 8 520-5034 520-5034
Jleft tilt bracket 1 061-T1383 061-7383
K
right tilt bracket 1 061-T1382 061-7382
Lsecurity allen wrench 1 560-9646 560-9646
MM6 x 12 mm socket pin screw 4 520-5023 520-5023
NM6 x 25 mm socket pin screw 4 520-5024 520-5024
OM8 x 15 mm socket pin screw 4 520-5026 520-5026
PM6 x 20 mm socket pin screw 4 520-5025 520-5025
QM8 x 25 mm socket pin screw 4 520-5027 520-5027
Rwasher 4 540-501
4
540-501
4
Support Column (B)
Parts List
B
Parts may appear slightly different than illustrated.
Before you begin, make sure all parts shown are included with your product.
C
A
D
F GE I
H
J
K
M N O RP Q
L
Product specificaties
Merk: | Peerless |
Categorie: | Flat panel steun |
Model: | ECMU-02-C |
Kleur van het product: | Zwart |
Gewicht verpakking: | 29900 g |
Montagewijze: | Plafond |
Maximale gewichtscapaciteit: | 91 kg |
Draaihoek: | 360 ° |
Aantal displays ondersteund: | 1 |
Bereik kantelhoek: | 5 - 15 ° |
Maximale schermgrootte: | 65 " |
Minimale schermgrootte: | 32 " |
Maximum afstand tot plafond: | 686 mm |
Montage gatenpatroon (H x V): | 720 x 449 mm |
Heb je hulp nodig?
Als je hulp nodig hebt met Peerless ECMU-02-C stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Flat panel steun Peerless
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
15 Februari 2024
Handleiding Flat panel steun
- Flat panel steun HP
- Flat panel steun Samsung
- Flat panel steun Pioneer
- Flat panel steun Abus
- Flat panel steun Acco
- Flat panel steun Apart
- Flat panel steun Atlantic
- Flat panel steun B-tech
- Flat panel steun BenQ
- Flat panel steun BlueBuilt
- Flat panel steun Digitus
- Flat panel steun Ematic
- Flat panel steun Ewent
- Flat panel steun Fellowes
- Flat panel steun Gembird
- Flat panel steun GPX
- Flat panel steun Hitachi
- Flat panel steun HQ
- Flat panel steun Icy Box
- Flat panel steun Iiyama
- Flat panel steun InFocus
- Flat panel steun Insignia
- Flat panel steun Kensington
- Flat panel steun Kogan
- Flat panel steun Konig
- Flat panel steun Luxor
- Flat panel steun Manhattan
- Flat panel steun Marantz
- Flat panel steun Nec
- Flat panel steun Newstar
- Flat panel steun Premier
- Flat panel steun Pyle
- Flat panel steun Reflecta
- Flat panel steun Speaka
- Flat panel steun Ultimate
- Flat panel steun Vogels
- Flat panel steun One For All
- Flat panel steun 3M
- Flat panel steun Monoprice
- Flat panel steun Schwaiger
- Flat panel steun Steren
- Flat panel steun Bell'O
- Flat panel steun SilverStone
- Flat panel steun Techly
- Flat panel steun SIIG
- Flat panel steun Sven
- Flat panel steun Tripp Lite
- Flat panel steun Sanus
- Flat panel steun Vision
- Flat panel steun LC-Power
- Flat panel steun Kondator
- Flat panel steun Barkan
- Flat panel steun Bretford
- Flat panel steun Chief
- Flat panel steun Gabor
- Flat panel steun Planar
- Flat panel steun Cabstone
- Flat panel steun Da-Lite
- Flat panel steun Peerless-AV
- Flat panel steun Valueline
- Flat panel steun BakkerElkhuizen
- Flat panel steun CTA Digital
- Flat panel steun Wentronic
- Flat panel steun SMS Smart Media Solutions
- Flat panel steun Proaim
- Flat panel steun AMX
- Flat panel steun Ergotron
- Flat panel steun Equip
- Flat panel steun Konig & Meyer
- Flat panel steun Atdec
- Flat panel steun StarTech.com
- Flat panel steun Anthro
- Flat panel steun Crimson
- Flat panel steun Panduit
- Flat panel steun Premier Mounts
- Flat panel steun Elite Screens
- Flat panel steun V7
- Flat panel steun SmartMetals
- Flat panel steun Unicol
- Flat panel steun Zaor
- Flat panel steun Dataflex
- Flat panel steun Multibrackets
- Flat panel steun Mount-It!
- Flat panel steun Rocstor
- Flat panel steun Amer
- Flat panel steun Avteq
- Flat panel steun Walker Edison
- Flat panel steun My Wall
- Flat panel steun LTN Technologies
- Flat panel steun Heckler
- Flat panel steun Helder
Nieuwste handleidingen voor Flat panel steun
20 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024
19 November 2024