Draper 253219 projection screen 253219 Handleiding

Draper Projectiescherm 253219 projection screen 253219

Lees hieronder de 📖 handleiding in het Nederlandse voor Draper 253219 projection screen 253219 (2 pagina's) in de categorie Projectiescherm. Deze handleiding was nuttig voor 32 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
Assembly/Mounting Instructions
Onyx Permanently Tensioned Projection Screen by Draper
Caution
Read instructions through completely before proceeding.
Follow instructions carefully. Installation con trary to instructions
invalidates warranty.
Screen should be accessible for complete removal should fabric
become damaged or should other ser vice be required.
Screen should be installed level (using a carpenter’s level).
Nothing should be fastened to screen frame or viewing surface.
Make sure you have received all parts (see parts list below and
exploded diagram on page 2).
Tools Required: Medium (#2) Phillips screwdriver (6" or greater shaft
length suggested). Optional tools: Flat blade screwdriver or small
putty knife.
Installer is responsible for providing appropriate hardware for mounting.
When lifting assembled screen, do not lift at only one corner; lift at
both corners. Lifting by one corner could result in damage to the
screen frame, especially on large screens.
The ideal temperature range for assembling folding screens to prevent
damaging the surface is 68°-78° F (20°-26° C). Assembling below
recommended temperatures may damage surface and void warranty.
NOTE: Screen has been thoroughly inspected and tested at factory and
found to be operating properly prior to shipment.
Copyright © 2010 Draper Inc. Form Onyx_Inst10 Printed in U.S.A.
®
If you encounter any diffi culties installing or ser vic ing your Onyx screen, call your
dealer or Draper, Inc., Spiceland, Indiana, (765) 987-7999 or fax (765) 987-7142.
Onyx—Hardware and Parts List
Frame Preparation
Clean area and place frame assembly pieces face down. Insert plastic
corner pieces into ends of aluminum frame extrusions as indicated in
Figures 1 through 4. Secure each corner to each frame extrusion by
threading one #10-24 fastener through hole in plastic corner and into
rounded slot in aluminum frame extrusion.
Caution: Do not over-tighten fasteners—over-tightening could cause
damage to the frame corners.
Figure 1
Secure corner pieces to aluminum frame extrusions with four (4) remaining
fasteners. Check to verify that all four (4) plastic corners are secure to
aluminum frame extrusion lengths and all eight (8) fasteners are tight (see
Fig. 5).
Caution: Do not over-tighten fasteners—over-tightening could cause
damage to the frame corners.
Figure 2
Frame Extrusions - 4
Frame Corners - 4
#10-24 fasteners - 8
Z-Brackets - 2
Viewing Surface - 1
Plastic Tubing - 4
Surface Retention
Extrusions- 4
Front
Back
Figure 3
Figure 5
Figure 4
(Continued on Page 2)
Patented by Draper, Inc., U.S. Patent Nos. 6,785,047; 7,113,332; and 7,369,310.
Caution: When lifting assembled screen, do not lift at only one corner; lift
at both corners. Lifting by one corner could result in damage to the screen
frame, especially on large screens.
Onyx by Draper Page 2 of 2
Figure 8
Mounting Screen to Wall
Determine height at which screen is to be mounted.
Please Note: Top edge of screen frame will be located 1.5"above mounting
bracket hole centerline when mounted to wall.
Mark hole centerline so that both Z-brackets can be mounted parallel and
at equal height.
Install Z-brackets so that the outermost edges are safely within the overall
length of the aluminum frame extrusion to allow for minor horizontal screen
adjustments. Installer is responsible for providing attachment hardware.
Position screen slightly above Z-brackets on wall (see Fig. 10).
Surface to Frame Assembly
Return frame onto clean surface, face down, and drape completed surface
assembly over completed frame profi le with rounded edge of surface
retention extrusion visible.
Insert any side of surface to notch #1 on corresponding side of frame
extrusion (see Fig. 8).
Insert opposite side of surface to notch #1 of frame extrusion.
Repeat steps 2-3 with remaining edges of surface.
Ensure surface retention extrusions are centered lengthwise in tension
slots on all 4 edges of surface.
If additional tension is desired or required over time, adjust surface one
edge at a time to tension notch #2.
Please Note: It is not necessary to adjust more than one edge at a time to
increase surface tension.
Z-brackets
supplied with
screen. Installer is
responsible for
ensuring appropriate
screws/bolts are used.
Wall
Figure 10
Lower screen until it engages over Z-brackets. Center screen horizontally
on brackets as necessary.
Please Note: Make sure screen is installed level.
Figure 6
Surface Preparation
Move frame assembly out of the way, unroll viewing surface and place on
smooth/clean surface. (Orient viewing surface so that folded side of hem is
visible.)
Insert plastic tubing inside pocket formed by hem on all 4 edges of viewing
surface (see Fig. 6).
slide surface retention extrusion (rounded edge visible) along Carefully
hem and onto surface on all 4 edges of fabric (see Fig. 7). Caution: Do
not allow fabric to snag on end of extrusion. If the screen
fabric is not parallel with the surface retention extrusion, then
it may slit and tear during installation.
Please Note: To make this step easier, pinch the end of the pocket closed
before sliding it into the surface retention extrusion.
Figure 7
Surface retention extrusion should extend beyond edge of viewing surface
equally at both ends.
Verify that all surface retention extrusions are installed with rounded edge
visible and are centered on surface material.
Plastic Tubing
Surface Retention
Extr sionu
Back of
V w uie ing S rface
Back of
V w uie ing S rface
Surface
Retention
Extr sionu
Fabric Attachment Extr sionsu
V wie ing
Surface
Onyx (Exploded Rear View)
1
5
/
8
"
4"
Onyx Frame
—Side Detail*
*Viewing surface is approximately ¼" from wall.
www.draperinc.com (765) 987-799
9
Corner Reinforcement
If screen is being fl own (suspended), raised and lowered by a TorkStar, or if
screen is 12' (viewing area) or larger in overall height or width, install
Corner reinforcement Gussets to all four corners (see Fig. 9)
Figure 9


Product specificaties

Merk: Draper
Categorie: Projectiescherm
Model: 253219 projection screen 253219
Kleur van het product: Black,White
Gewicht: 29480 g
Oorspronkelijke beeldverhouding: 16:9
Zichtbare schermhoogte (h): 2032 mm
Zichtbare schermbreedte (b): 3556 mm
Diagonaal: 161 "
Totale grootte van het scherm (hoogte x breedte): 2235 x 3759 cm
Formaat: HDTV
Grenzen: 101.6 mm

Heb je hulp nodig?

Als je hulp nodig hebt met Draper 253219 projection screen 253219 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Projectiescherm Draper

Handleiding Projectiescherm

Nieuwste handleidingen voor Projectiescherm