AMX CB-TP5ib Handleiding
AMX
Flat panel steun
CB-TP5ib
Lees hieronder de 📖 handleiding in het Nederlandse voor AMX CB-TP5ib (2 pagina's) in de categorie Flat panel steun. Deze handleiding was nuttig voor 30 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld
Pagina 1/2
Installation Guide
CB-TP5i Rough-In Box for NXD-500i 5" Touch Panel
Overview
The CB-TP5i Rough-In Box (FG038-11) is an optional accessory for the NXD-500i
Modero® Wall/Flush Mount Touch Panel. The Rough-In Box allows the panel to be
mounted directly to the studs/pre-wall. The NXD-500i is contained within a plastic
outer housing or back box, and the back box attaches to the Rough-In Box.
Specifications
WARNING: In order to guarantee a stable installation of the NXD-500i, the distance
between the CB-TP5i and the outer wall surface must be a minimum of .50 inches
(1.27cm) and a maximum of .875 inches (2.22cm).
• Refer to the SP62-0038-01 diagram for detailed installation dimensions.
Pre-Wall Installation of the CB-TP5i Rough-In Box
1. Remove the rough-in box cover (A in FIG. 1) before installation of the Rough-In
Box (B). Note: the cover MUST be removed before drywall installation. The
cover may be reinstalled after drywall installation using 4-40 screws (not
included).
2. Attach the optional Back Cover for the CB-TP5i (FG038-12) if necessary, as
required by building codes. (For more information, refer to the Back Cover
ï€
Installation section on page 2.)
3. Fasten the CB-TP5i rough-in box to the stud through the holes on the Stud
Mounting tabs (FIG. 2), using either nails or screws (not provided).
4. Remove the appropriate wiring knockouts from the rough-in box to ï€
accommodate the cables being threaded through to the NXD-500i touch panel.
5. Thread the incoming Ethernet and USB wiring through the knockouts. Use of the
left wiring knockouts is recommended with this installation for ease of connection
of the cables to the touch panel. Leave enough slack in the wiring to ï€
accommodate installation of the panel.
6. Install the drywall/sheetrock before inserting the main NXD-500i device into the
CB-TP5i.
7. Cut out the opening for the NXD-500i where the wall has been placed over the
Rough-In Box. Cutting out the surface slightly smaller than what is outlined in the
installation drawings, so that you can make any necessary cutout adjustments, is
very highly recommended.
FIG. 1 CPB-TP5i Rough-In Box - Front and Back Views
CB-TP5i (FG038-11) Specifications
Dimensions (HWD) • 6.73" x 9.30" x 1.43"
• 17.09 cm x 23.62 cm x 3.63 cm
Certifications • UL 508A
Front Rear
Wiring Knockouts
Breakaway Stud
Mounting Flanges
A
B
2 locations to secure cover
after applying drywall
(8-32 x .25 screws)
3 locations to secure cover
after applying drywall
FIG. 2 CB-TP5i - Mounted to Wall Stud
Stud
Recommended Cutout for
CB-TP5i Rough-In Box
For full warranty information, refer to the AMX Instruction Manual(s) associated with your Product(s).
4/11
©2011 AMX. All rights reserved. AMX and the AMX logo are registered trademarks of AMX.
AMX reserves the right to alter specifications without notice at any time.
3000 RESEARCH DRIVE, RICHARDSON, TX 75082 • 800.222.0193 • fax 469.624.7153 • technical support 800.932.6993 • www.amx.com
93-038-11 REV: B
CB-TP5i Top CB-TP5i Break-Away
Side of Rough-In Box
With Break-Away Flanges
Optional Back Cover
for the CB-TP5i (FG038-12)
(Only for areas where
required by building codes.)
Flange detail
Back Cover Installation
Assembly of CB-TP5i and Back Plate
Screws (80-0114-01), #4-20 x .375
CB-TP5i
Back Plate
Note: two screw holes in
flanges at top and bottom
of Back Plate, but one
screw hole per flange on
sides.
Product specificaties
Merk: | AMX |
Categorie: | Flat panel steun |
Model: | CB-TP5ib |
Kleur van het product: | Zwart |
Breedte: | 131 mm |
Diepte: | 86 mm |
Hoogte: | 109 mm |
Compatibiliteit: | NXD-500i\nNXD-435\nNXD-430\nCB-TP5i |
Afmetingen (B x D x H): | 131 x 86 x 109 mm |
Heb je hulp nodig?
Als je hulp nodig hebt met AMX CB-TP5ib stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Flat panel steun AMX
13 November 2023
13 November 2023
13 November 2023
13 November 2023
13 November 2023
13 November 2023
13 November 2023
Handleiding Flat panel steun
- Flat panel steun HP
- Flat panel steun Samsung
- Flat panel steun Pioneer
- Flat panel steun Abus
- Flat panel steun Acco
- Flat panel steun Akai
- Flat panel steun Apart
- Flat panel steun Atlantic
- Flat panel steun B-tech
- Flat panel steun BenQ
- Flat panel steun Blaupunkt
- Flat panel steun BlueBuilt
- Flat panel steun Dell
- Flat panel steun Digitus
- Flat panel steun Ematic
- Flat panel steun Ewent
- Flat panel steun Fellowes
- Flat panel steun Gembird
- Flat panel steun GPX
- Flat panel steun Hitachi
- Flat panel steun HQ
- Flat panel steun Icy Box
- Flat panel steun Iiyama
- Flat panel steun InFocus
- Flat panel steun Insignia
- Flat panel steun Kensington
- Flat panel steun Kogan
- Flat panel steun Konig
- Flat panel steun Luxor
- Flat panel steun Manhattan
- Flat panel steun Marantz
- Flat panel steun Nec
- Flat panel steun Newstar
- Flat panel steun Peerless
- Flat panel steun Premier
- Flat panel steun Pyle
- Flat panel steun Reflecta
- Flat panel steun Speaka
- Flat panel steun Ultimate
- Flat panel steun Vogels
- Flat panel steun One For All
- Flat panel steun 3M
- Flat panel steun Monoprice
- Flat panel steun Schwaiger
- Flat panel steun Steren
- Flat panel steun Bell'O
- Flat panel steun SilverStone
- Flat panel steun Techly
- Flat panel steun SIIG
- Flat panel steun Sven
- Flat panel steun Tripp Lite
- Flat panel steun Sanus
- Flat panel steun Vision
- Flat panel steun LC-Power
- Flat panel steun Kondator
- Flat panel steun Barkan
- Flat panel steun Bretford
- Flat panel steun Chief
- Flat panel steun Gabor
- Flat panel steun Planar
- Flat panel steun SunBriteTV
- Flat panel steun Cabstone
- Flat panel steun Da-Lite
- Flat panel steun Peerless-AV
- Flat panel steun Valueline
- Flat panel steun BakkerElkhuizen
- Flat panel steun CTA Digital
- Flat panel steun Wentronic
- Flat panel steun SMS Smart Media Solutions
- Flat panel steun Proaim
- Flat panel steun Ergotron
- Flat panel steun Equip
- Flat panel steun Konig & Meyer
- Flat panel steun Atdec
- Flat panel steun StarTech.com
- Flat panel steun Anthro
- Flat panel steun Crimson
- Flat panel steun Panduit
- Flat panel steun Premier Mounts
- Flat panel steun Elite Screens
- Flat panel steun Kanto
- Flat panel steun V7
- Flat panel steun SmartMetals
- Flat panel steun Unicol
- Flat panel steun Alogic
- Flat panel steun Zaor
- Flat panel steun Dataflex
- Flat panel steun Multibrackets
- Flat panel steun Mount-It!
- Flat panel steun Rocstor
- Flat panel steun Amer
- Flat panel steun Avteq
- Flat panel steun Walker Edison
- Flat panel steun My Wall
- Flat panel steun LTN Technologies
- Flat panel steun Heckler
- Flat panel steun Helder
- Flat panel steun NeoMounts
Nieuwste handleidingen voor Flat panel steun
1 Januari 2025
24 December 2024
24 December 2024
18 December 2024
18 December 2024
17 December 2024
17 December 2024
17 December 2024
17 December 2024
17 December 2024