Wolf CGB-2-100 Handleiding

Wolf CV Ketel CGB-2-100

Lees hieronder de 📖 handleiding in het Nederlandse voor Wolf CGB-2-100 (64 pagina's) in de categorie CV Ketel. Deze handleiding was nuttig voor 40 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/64
WOLF GMBH / POSTFACH 1380 / D-84048 MAINBURG / TEL. +49.0.87 51 74- 0 / FAX +49.0.87 51 74- 16 00 / www.WOLF.eu
Doc. no.: 3062555_201804 Subjecttomodications
GB
Installationandoperatinginstructions
Wall mounted gas condensing boiler
CGB wall mounted gas condensing boiler
CGB-75
CGB-100
2 3062555_201804
Tableofcontents
1. Documentation information 3 ................................................................
2. Safety information 4 ..............................................................................
3. Standards and regulations 7 .................................................................
4. Control / Function / Operation 10 ........................................................
5. Delivered condition / standard delivery 12 ............................................
6. Layout ..............................................................................................13
7. Siting instructions 14 ............................................................................
8. Installation .......................................................................................15
9. Dimensions/installation dimensions 16 .................................................
Installation
10. Installation .......................................................................................17
11. Installation of the air/flue gas routing 21 ...............................................
Control
12. Electrical connection 22 ........................................................................
Commissioning
13. Filling the system 28 .............................................................................
14. Conversion to natural gas E/LL (G20/G25) (if necessary) 29 ...............
15. Conversion to LPG P (G31) (if necessary) 30 ......................................
16. Conversion to other gas types (if required) 31 .....................................
17. Checking the gas supply pressure 32 ..................................................
18. Commissioning / setting the BUS address 33 ......................................
19. Displaying / modifying control parameters 34 .......................................
20. Adjusting the modulating pump (accessory) 35 ....................................
21. Limiting the maximum output 36 ...........................................................
22. Testing the combustion parameters 37 .................................................
23. CO2 adjustments 38 .............................................................................
24. Commissioning report 40 ......................................................................
Speciîš¿cation
25. Maintenance and design data 41 .........................................................
26. Technical information for water treatment 43 ........................................
27. System log 45 .......................................................................................
28. Technical information 46 .......................................................................
29. Wiring diagram 56 ................................................................................
30. Specification .................................................................................... 57
31. Troubleshooting ...............................................................................58
32. Product datasheet to EU regulation No. 811/2013 60 ..........................
33. Technical parameters to EU Regulation No. 813/2013 61 ....................
34. Notes ............................................................................................... 62
EU declaration of conformity 63 ...................................................................
33062555_201804
1. Documentationinformation
1.1 Otherapplicabledocuments
- Technical information
- Maintenance instructions
- System and operator’s log
The instructions for all accessory modules and other accessories also apply where
relevant.
1.2 Safekeepingofthesedocuments
The system user or operator should ensure the safekeeping of all instruction manuals
and documents.
► Handovertheseinstallationinstructionsaswellasallotherapplicablemanuals
to the system user or operator.
1.3 Instructingthesystemuser
- Instruct the system user to take out an inspection and maintenance contract with
an approved contractor.
- Inform the system use that the annual inspection and maintenance may only be
performed by an approved contractor.
- Inform the system use that repair work may only be performed by an approved
contractor.
- Inform the system user that only original spare parts may be used.
- Inform the system user that no technical changes may be made to the boiler or
control unit.
- Inform the system user that they are responsible for the safety, environmental com-
patibility and energy quality of the heating system (German Immission Control Act/
Energy Saving Ordinance) [Germany].
- Inform the system user that these instructions and the other applicable documents
must be kept in a safe place.
- Instruct the system user how to operate the heating system.
1.4 Applicabilityoftheseinstructions
These installation instructions apply to CGB-75/100 gas condensing boilers.
1.5 Acceptance
Within four weeks of commissioning of the burner the operator must notify the local
flue gas inspector accordingly. According to the Bundes-KÃœO (German Federal
Sweeping and Inspection Act), tests and inspections are only required every 3 years
[Germany].
1.6 Recyclinganddisposal
- Old equipment may only be disconnected from the gas and electricity supply by a
qualiedcontractor.
- Always dispose of materials according to environmental, recycling and waste man-
agement standards.
- Old appliances, wearing parts, defective components and environmentally hazard-
ous liquids and oils must be disposed of or recycled according to applicable waste
disposal regulations without harming the environment.
Theymustnotbedisposedofashouseholdwaste.
- Disposeofpackagingmadeofcardboard,recyclableplasticsandsyntheticller
materials in an environmentally compatible manner through appropriate recycling
systems or a recycling centre.
- Please observe the applicable national and local regulations.


Product specificaties

Merk: Wolf
Categorie: CV Ketel
Model: CGB-2-100

Heb je hulp nodig?

Als je hulp nodig hebt met Wolf CGB-2-100 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding CV Ketel Wolf

Wolf

Wolf CGG-1K-24 Handleiding

14 November 2023
Wolf

Wolf FGB-K-35 Handleiding

14 November 2023
Wolf

Wolf FGB-K-28 Handleiding

13 November 2023
Wolf

Wolf CGB-2-75 Handleiding

13 November 2023
Wolf

Wolf CGG-1K-28 Handleiding

13 November 2023
Wolf

Wolf FGB-24 Handleiding

13 November 2023
Wolf

Wolf CGB-2-100 Handleiding

13 November 2023
Wolf

Wolf CGB-2K-20 Handleiding

9 Februari 2023

Handleiding CV Ketel

Nieuwste handleidingen voor CV Ketel