Vokèra Unica i28 Handleiding

Vokèra CV Ketel Unica i28

Lees hieronder de 📖 handleiding in het Nederlandse voor Vokèra Unica i28 (44 pagina's) in de categorie CV Ketel. Deze handleiding was nuttig voor 53 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/44
44
Users Instructions
Installation &
Servicing
Instructions
THESE INSTRUCTIONS
TO BE RETAINED
BY USER
V
V
V
Vokèra
okèra
okèra
okèra is
is
is
is a
a
a
a licensed
licensed
licensed
licensed member
member
member
member of
of
of
of the
the
the
the Benchmark
Benchmark
Benchmark
Benchmark scheme
scheme
scheme
scheme Vokèra is a licensed member of the Benchmark scheme
which
which
which
which aims
aims
aims
aims t
t
t
to
o
o
o impr
impr
impr
improve
ove
ove
ove th
th
th
the
e
e
e stan
stan
stan
standards
dards
dards
dards of
of
of
of ins
ins
ins
installation
tallation
tallation
tallation and
and
and
and which aims to improve the standards of installation and
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.commissioning of domestic hot water systems in the UK.
Unica i28 i32 - i36 -
High ef ciency combi boiler
G.C. NUMBER
Unica i28 47 364 14
Unica i32 47 364 15
Unica i36 47 364 16
40
Users instructions
Things you should know Page
1.1 Gas appliances 1
1.2 Electrical supply 1
1.3 Guarantee registration card 1
1.4 Appliance Log Book (UK only) 1
1.5 How does it work? 1
1.6 Dimensions 1
1.7 Clearances required 1
1.8 Frost protection system 1
1.9 Appliance status indicators 1
Getting started Page
2.1 Before switching ON 4
2.2 Appliance controls 4
2.3 Lighting the boiler 4
2.4 Adjusting the heating temperature 4
2.5 Adjusting the hot water temperature 4
2.6 Explanation of features 4
2.7 Automatic temperature control 4
How to... Page
3.1 How to top-up the system pressure 4
3.2 How to reset the appliance 4
3.3 How to shut down the system for short periods 4
3.4 How to shut down the system for long periods 4
3.5 How to care for the appliance 4
What if... Page
4.1 What if I suspect a gas leak 5
4.2 What if I have frequently top-up the system 5
4.3 What if the appliance is due its annual service 5
4.4 What if I need to call an engineer
5
Installation and Servicing instructions
Design principles & operating sequence Page
1.1 Principle components 7
1.2 Mode of operation (at rest) 7
1.3 Mode of operation (heating) 7
1.4 Mode of operation (Hot water) 7
1.5 Safety devices 7
Technical data Page
2.1 Central heating 8
2.2 Domestic hot water 8
2.3 Gas pressures 8
2.4 Expansion vessel 8
2.5 Dimensions 8
2.6 Clearances 8
2.7 Connections 8
2.8 Electrical 8
2.9 Flue details (concentric 60-100) 8
2.9A Flue details (concentric 80-125) 8
2.9B Flue details (twin pipes) 8
2.10 Ef ciency 9
2.11 Emissions 9
2.12 Pump duty 9
General requirements (UK) Page
3.1 Related documents 10
3.2 Location of appliance 10
3.3 Gas supply 10
3.4 Flue system 10
3.5 Air supply 10
3.6 Water circulation 10
3.7 Electrical supply 11
3.8 Mounting on a combustible surface 11
3.9 Timber framed buildings 11
3.10 Inhibitors 11
3.11 Showers 11
General requirements (EIRE) Page
3A.1 Related documents 11
3A.2 Location of appliance 11
3A.3 Gas supply 11
3A.4 Flue system 11
3A.5 Air supply 12
3A.6 Water circulation 12
3A.7 Electrical supply 12
3A.8 Mounting on a combustible surface 12
3A.9 Timber framed buildings 12
3A.10 Inhibitors 12
3A.11 Showers 12
3A.12 Declaration of conformity 12
Installation Page
4.1 Delivery 13
4.2 Contents 13
4.3 Unpacking 13
4.4 Preparation for mounting the appliance 13
4.5 Fitting the ue 14
4.6 Connecting the gas & water 18
4.7 Electrical connections 18
Commissioning Page
5.1 Gas supply installation 19
5.2 The heating system 19
5.3 Initial lling of the system 19
5.4 Initial ushing of the system 19
5.5 Pre-operation checks 19
5.6 Initial lighting 19
5.7 Checking gas pressure & combustion analysis 19
5.8 Final ushing of the heating system 19
5.9 Setting the boiler operating temperature 19
5.10 Setting the system design pressure 19
5.11 Regulating the central heating system 19
5.12 Final checks 20
5.13 Instructing the user 20
Servicing Page
6.1 General 20
6.2 Routine annual servicing 20
6.3 Replacement of components 20
6.4 Component removal procedure 20
6.5 Pump assembly 21
6.6 Safety valve 21
6.7 Lower automatic air release valves 21
6.8 Water pressure switch 21
6.9 Flow thermistor 21
6.10 Return thermistor 21
6.11 Printed circuit board 21
6.12 Gas valve 22
6.13 Electrodes & condense sensor 22
6.14 Flue fan & mixer 22
6.15 Burner 22
6.16 Main heat exchanger 23
6.17 Automatic by-pass & DHW non-return valve 23
6.18 Expansion vessel 23
6.19 Condense trap removal 23
6.20 Flue collector removal 24
Checks, adjustments and fault nding Page
7.1 Checking appliance operation 25
7.2 Appliance modes of operation 25
7.3 Checking the CO2 & adjusting the valve 25
7.4 Combustion analysis test 26
7.5 Checking the expansion vessel 26
7.6 External faults 26
7.7 Electrical checks 26
7.8 Fault nding 27
7.9 Component values & characteristics 27
7.10 Adjustments 28
7.11 Historical alarms 31
Wiring diagrams Page
8.1 External wiring 32
8.2 Typical control application 32
8.3 Other devices 32
L.P.G. instructions Page
9.1 Related documents 34
9.2 Technical data 34
9.3 Converting the appliance gas type 34
9.4 Gas supply 34
9.5 Gas supply installation 34
9.6 Checking the CO2 and adjusting the gas valve 34
Commissioning 36
Benchmark 37-39
1
USERS INSTRUCTIONS
1.1 GAS APPLIANCES
Gas Safety (Installation and Use) Regulation (UK).
In the interests of your safety and that of others it is a legal
requirement that all gas appliances are installed and correctly
maintained by a competent person and in accordance with the
latest regulations.
1.2 ELECTRICAL SUPPLY
Please ensure that this appliance has been properly connected
to the electrical supply by means of a double pole isolator or
un-switched socket, and that the correct size of fuse (3 AMP)
has been tted.
Warning: this appliance must be earthed!
1.3 GUARANTEE REGISTRATION CARD
Please take the time to ll out your guarantee registration card.
The completed warranty card should be posted within 30 days
of installation.
1.4 APPLIANCE COMMISSIONING CHECKLIST
(UK only)
A checklist section can be found at the rear of the appliance
installation booklet. This important document must be com-
pleted during the installation/commissioning of your boiler. All
GAS SAFE registered installers carry a GAS SAFE ID card,
and have a registration number. These details should be re-
corded in the Benchmark commissioning checklist section
within the installation booklet. You can check your installers
details by calling GAS SAFE direct on 08004085500. Failure
to install and commission the appliance in accordance with
the manufacturers instructions will invalidate the warranty.
This does not affect your statutory rights.
1.5 HOW DOES IT WORK?
Your Unica boiler supplies heated water to your radiators and
hot water to your hot water taps. The central heating is con-
trolled via a time clock and any thermostats that your installer
may have tted. The boiler will light when it receives a request
from the time clock via any thermostat that may be installed, or
whenever a hot water outlet (tap) is opened. Your
Unica boiler
lights electronically and does not have a pilot light.
In the unlikely event of a fault developing with your boiler, the
supply of gas to the burner will be terminated automatically.
Dear Customer
Your Vokèra Unica boiler has been designed to meet and exceed the very latest standards in gas central heating technology,
and if cared for, will give years of reliable use and ef ciency.
Please therefore take some time to read these instructions carefully.
Do’s and Don’t’s
- ensure that the system pressure is periodically checkedDo
- ensure that the boiler should not be used by children or unassisted disabled peopleDo
- ensure that you know how to isolate the appliance in an emergencyDo
- ensure that you are familiar with the appliance controlsDo
- ensure that your installer has completed the appliance log book sectionDo
- attempt to remove the appliance casing or gain internal accessDo not
- hang clothes etc. over the applianceDo not
- forget to have the appliance serviced annually.Do not
This booklet is an integral part of the appliance. It is therefore necessary to ensure that the booklet is handed to the person re-
sponsible for the property in which the appliance is located/installed. A replacement copy can be obtained from Vokèra customer
services.
INTRODUCTION
1.6 DIMENSIONS
1.7 CLEARANCES REQUIRED
1.8 FROST PROTECTION SYSTEM
The Unica is equipped with a built-in frost protection system,
this enables the boiler to over-ride the time controls even if
switched off and operate the burner and/or pump, should
the temperature drop below 5
0C for the main and for the DHW
line. In particular the burner will be in ON status until the main
temperature reaches 35°C for CH appliance and 55°C for
DHW appliance. Please note that the frost protection system
is designed to protect the appliance only, should frost protec-
tion be required for the heating system, additional controls
may be required.
NOTE
The frost protection system is reliant on the appliance having a
permanent electrical supply, and being in a non-fault condition.
1.9 APPLIANCE STATUS INDICATORS
Your boiler is equipped with a large LCD display that indicates
the appliance operating status.
1. THINGS YOU SHOULD KNOW
Unica i28 Unica i32 Unica i36
HEIGHT 780 mm 780 mm 780 mm
WIDTH 400 mm 400 mm 400 mm
DEPTH 358 mm 358 mm 384 mm
ABOVE 150 mm
BELOW 150 mm
LEFT SIDE 12 mm
RIGHT SIDE 12 mm
FRONT 600 mm


Product specificaties

Merk: Vokèra
Categorie: CV Ketel
Model: Unica i28

Heb je hulp nodig?

Als je hulp nodig hebt met Vokèra Unica i28 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding CV Ketel Vokèra

Handleiding CV Ketel

Nieuwste handleidingen voor CV Ketel