Vokèra Mynute i30 Handleiding
Lees hieronder de 📖 handleiding in het Nederlandse voor Vokèra Mynute i30 (40 pagina's) in de categorie CV-ketels. Deze handleiding was nuttig voor 38 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld
Pagina 1/40
40
Users Instructions
Installation &
Servicing
Instructions
THESE INSTRUCTIONS
TO BE RETAINED
BY USER
V
V
V
Vokèra
okèra
okèra
okèra is
is
is
is a
a
a
a licensed
licensed
licensed
licensed member
member
member
member of
of
of
of the
the
the
the Benchmark
Benchmark
Benchmark
Benchmark scheme
scheme
scheme
scheme Vokèra is a licensed member of the Benchmark scheme
which
which
which
which aims
aims
aims
aims t
t
t
to
o
o
o impr
impr
impr
improve
ove
ove
ove th
th
th
the
e
e
e stan
stan
stan
standards
dards
dards
dards of
of
of
of ins
ins
ins
installation
tallation
tallation
tallation and
and
and
and which aims to improve the standards of installation and
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.
commissioning of domestic hot water systems in the UK.commissioning of domestic hot water systems in the UK.
Mynute i
High effi ciency system boiler
Mynute G.C. N. 41 094 81 i20
Mynute G.C. N. 41 094 82i30
37
Users instructions
Things you should know Page
1.1 Gas appliances 1
1.2 Electrical supply 1
1.3 Guarantee registration card 1
1.4 Appliance Log Book (UK only) 1
1.5 How does it work? 1
1.6 Dimensions 1
1.7 Clearances required 1
1.8 Frost protection system 1
1.9 Appliance status indicators 1
Getting started Page
2.1 Before switching ON 3
2.2 Appliance controls 3
2.3 Lighting the boiler 3
2.4 Adjusting the heating temperature 3
2.5 Explanation of features 3
2.6 Automatic temperature control 3
How to... Page
3.1 How to top-up the system pressure 4
3.2 How to reset the appliance 4
3.3 How to shut down the system for short periods 4
3.4 How to shut down the system for long periods 4
3.5 How to care for the appliance 4
What if... Page
4.1 What if I suspect a gas leak 4
4.2 What if I have frequently top-up the system 4
4.3 What if the appliance is due its annual service 4
4.4 What if I need to call an engineer 4
Installation and Servicing instructions
Design principles & operating sequence Page
1.1 Principle components 7
1.2 Mode of operation (at rest) 7
1.3 Mode of operation (heating) 7
1.4 Safety devices 7
Technical data Page
2.1 Central heating 8
2.2 Gas pressures 8
2.3 Expansion vessel 8
2.4 Dimensions 8
2.5 Clearances 8
2.6 Connections 8
2.7 Electrical 8
2.8 Flue details (concentric) 8
2.8A Flue details (twin pipes) 8
2.9 Effi ciency 8
2.10 Emissions 8
2.11 Pump duty 9
General requirements (UK) Page
3.1 Related documents 10
3.2 Location of appliance 10
3.3 Gas supply 10
3.4 Flue system 10
3.5 Air supply 10
3.6 Water circulation 10
3.7 Electrical supply 11
3.8 Mounting on a combustible surface 11
3.9 Timber framed buildings 11
3.10 Inhibitors 11
General requirements (EIRE) Page
3A.1 Related documents 11
3A.2 Location of appliance 11
3A.3 Gas supply 11
3A.4 Flue system 11
3A.5 Air supply 12
3A.6 Water circulation 12
3A.7 Electrical supply 12
3A.8 Mounting on a combustible surface 12
3A.9 Timber framed buildings 12
3A.10 Inhibitors 12
3A.11 Declaration of conformity 12
Installation Page
4.1 Delivery 13
4.2 Contents 13
4.3 Unpacking 13
4.4 Preparation for mounting the appliance 13
4.5 Fitting the fl ue 13
4.6 Connecting the gas & water 17
4.7 Electrical connections 17
Commissioning Page
5.1 Gas supply installation 18
5.2 The heating system 18
5.3 Initial fi lling of the system 18
5.4 Initial fl ushing of the system 18
5.5 Pre-operation checks 18
5.6 Initial lighting 18
5.7 Checking gas pressure & combustion analysis 18
5.8 Final fl ushing of the heating system 18
5.9 Setting the boiler operating temperature 18
5.10 Setting the system design pressure 18
5.11 Regulating the central heating system 19
5.12 Final checks 19
5.13 Instructing the user 19
Servicing Page
6.1 General 19
6.2 Routine annual servicing 19
6.3 Replacement of components 19
6.4 Component removal procedure 19
6.5 Pump assembly 20
6.6 Safety valve 20
6.7 Lower automatic air release valves 20
6.8 Water pressure switch 20
6.9 Flow thermistor 20
6.10 Return thermistor 20
6.11 Printed circuit board 20
6.12 Gas valve 21
6.13 Electrodes 21
6.14 Flue fan & mixer 21
6.15 Burner 21
6.16 Main heat exchanger 22
6.17 Automatic by-pass 22
6.18 Expansion vessel removal 22
6.19 Condense trap removal 22
6.20 Flue collector removal 23
Checks, adjustments and fault fi nding Page
7.1 Checking appliance operation 23
7.2 Appliance modes of operation 23
7.3 Checking the CO2 & adjusting the valve 24
7.4 Combustion analysis test 24
7.5 Checking the expansion vessel 24
7.6 External faults 25
7.7 Electrical checks 25
7.8 Fault fi nding 25
7.9 Component values & characteristics 25
7.10 Adjustments 26
Wiring diagrams Page
8.1 External wiring 29
8.2 Typical control applications 29
8.3 Other devices 29
L.P.G. instructions Page
9.1 Related documents 31
9.2 Technical data 31
9.3 Converting the appliance gas type 31
9.4 Gas supply 31
9.5 Gas supply installation 31
9.6 Checking the CO2 and adjusting the gas valve 31
Benchmark 34-35
Commissioning 36
1
USERS INSTRUCTIONS
1.1 GAS APPLIANCES
Gas Safety (Installations and Use) Regulations (UK).
In the interests of your safety and that of others it is a legal
requirement that all gas appliances are installed and correctly
maintained by a competent person and in accordance with the
latest regulations.
1.2 ELECTRICAL SUPPLY
Please ensure that this appliance has been properly connected
to the electrical supply by means of a double pole isolator or
un-switched socket, and that the correct size of fuse (3 AMP)
has been fi tted.
Warning: this appliance must be earthed!
1.3 GUARANTEE REGISTRATION CARD
Please take the time to fi ll out your guarantee registration card.
The completed warranty card should be posted within 30 days
of installation.
1.4 APPLIANCE COMMISSIONING CHECKLIST
(UK only)
A checklist section can be found at the rear of the appliance
installation booklet. This important document must be com-
pleted during the installation/commissioning of your boiler. All
GAS SAFE registered installers carry a GAS SAFE ID card,
and have a registration number. These details should be re-
corded in the Benchmark commissioning checklist section
within the installation booklet. You can check your installers
details by calling GAS SAFE direct on 08004085500. Failure
to install and commission the appliance in accordance with
the manufacturers instructions will invalidate the warranty.
This does not affect your statutory rights.
1.5 HOW DOES IT WORK?
Your Mynute i boiler supplies heated water to your radiators
and hot water to your hot water tank. The central heating is
controlled via a time clock and any thermostats that your installer
may have fi tted. The boiler will light when it receives a request
from the time clock via any thermostat that may be installed.
Your Mynute i boiler lights electronically and does not have a pilot
light. In the unlikely event of a fault developing with your boiler,
the supply of gas to the burner will be terminated automatically.
Dear Customer
Your Vokèra Mynute boiler has been designed to meet and exceed the very latest standards in gas central heating technology, i
and if cared for, will give years of reliable use and effi ciency.
Please therefore take some time to read these instructions carefully.
Do’s and Don’t’s
- ensure that the system pressure is periodically checkedDo
- ensure that the boiler should not be used by children or unassisted disabled peopleDo
- ensure that you know how to isolate the appliance in an emergencyDo
- ensure that you are familiar with the appliance controlsDo
- ensure that your installer has completed the appliance log book sectionDo
- attempt to remove the appliance casing or gain internal accessDo not
- hang clothes etc. over the applianceDo not
- forget to have the appliance serviced annually.Do not
This booklet is an integral part of the appliance. It is therefore necessary to ensure that the booklet is handed to the person re-
sponsible for the property in which the appliance is located/installed. A replacement copy can be obtained from Vokèra customer
services.
INTRODUCTION
1.6 DIMENSIONS
1.7 CLEARANCES REQUIRED
1.8 FROST PROTECTION SYSTEM
The Mynute i is equipped with a built-in frost protection system,
this enables the boiler to over-ride the time controls – even if
switched off – and operate the burner and/or pump, should
the temperature drop below 50C for the main. In particular the
burner will be in ON status until the main temperature reaches
35°C for CH appliance.
Please note that the frost protection system is designed to
protect the appliance only, should frost protection be required
for the heating system, additional controls may be required.
NOTE
The frost protection system is reliant on the appliance having a
permanent electrical supply, and being in a non-fault condition.
1.9 APPLIANCE STATUS INDICATORS
Your boiler is equipped with a large LCD display that indicates
the appliance operating status.
1. THINGS YOU SHOULD KNOW
Mynute Mynute i20 i30
HEIGHT 780 mm 780 mm
WIDTH 400 mm 400 mm
DEPTH 338 mm 388 mm
ABOVE 150 mm
BELOW 150 mm
LEFT SIDE 12 mm
RIGHT SIDE 12 mm
FRONT 600 mm
Product specificaties
Merk: | Vokèra |
Categorie: | CV-ketels |
Model: | Mynute i30 |
Heb je hulp nodig?
Als je hulp nodig hebt met Vokèra Mynute i30 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding CV-ketels Vokèra
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
Handleiding CV-ketels
- CV-ketels Bosch
- CV-ketels ATAG
- CV-ketels Junkers
- CV-ketels Nefit
- CV-ketels Remeha
- CV-ketels Vaillant
- CV-ketels ACV
- CV-ketels Bulex
- CV-ketels Ferroli
- CV-ketels Intergas
- CV-ketels Saunier Duval
- CV-ketels Viessmann
- CV-ketels EAS Electric
- CV-ketels Baxi
- CV-ketels Glow-worm
- CV-ketels Halstead
- CV-ketels Ravenheat
Nieuwste handleidingen voor CV-ketels
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022
3 Oktober 2022