Sloan WES-1000 Handleiding

Sloan Toilet WES-1000

Lees hieronder de 📖 handleiding in het Nederlandse voor Sloan WES-1000 (2 pagina's) in de categorie Toilet. Deze handleiding was nuttig voor 42 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
SET DRAIN LINE HEIGHT 16” from finished
floor (standard 24” rim) or 9 ” maximum for ADA
installation. Threaded nipple should extend ½ to
¾” from wall.
A. Clean face of existing wall flange.
B. Install the brass flange with the clear
inspection disc.
C. Slowly pour water into the drain.
D. Use a flashlight to check the pitch/
slope. There should be no water present in
the inspection disc or nipple.
E. Remove flange after inspection.
DRILL HOLES with
5/16" masonry bit
for the lower anchor
screws and insert
plastic anchors.
TIGHTEN
COMPRESSION
NUT AND GEAR
CLAMP.
DETERMINE THE DRAIN NIPPLE DEPTH by
measuring the distance between the back of
the sanitary tee (or elbow) to the front edge of
the nipple.
PLACE THE GEAR CLAMP
and compression nut onto
the housing tailpipe.
LEVEL THE BRACKET THEN MARK, drill and
install two additional plastic anchors and screws.
If pre-existing bearing rods can be used, screws
are not necessary.
MEASURE & MARK THE ROUGH-IN if in-wall
carrier is not used. Use a 5/16" masonry bit
to drill hole, then install the hanger bracket
with one plastic anchor and screw.
Measure drain nipple depth (in)
to find trim length (in)
13 78
" or more DO NOT CUT
3 ¾" or less DO NOT USE TUBE
TUBE CUTTING CHART
OR LESS TRIM
13 ¾" ¼"
13 ½ ½
13 ¼ ¾
13 1
12 ¾
12 ½
12 ¼
12 2
11 ¾
11 ½
11 ¼
11 3
10 ¾ 3 ¼
10 ½ 3 ½
OR LESS TRIM
10 ¼" "3 ¾
10 4
9 ¾ 4 ¼
9 ½ 4 ½
9 ¼ 4 ¾
95
8 ¾" 5 ¼
8 ½ 5 ½
8 ¼ 5 ¾
86
7 ¾ 6 ¼
7 ½ 6 ½
7 ¼ 6 ¾
77
OR LESS TRIM
6 ¾" "7 ¼
6 ½ 7 ½
6 ¼ 7 ¾
68
5 ¾ 8 ¼
5 ½ 8 ½
5 ¼ 8 ¾
59
4 ¾ 9 ¼
4 ½ 9 ½
4 ¼ 9 ¾
410
1-888-SLOAN-14 (888-756-2614)
customer.service@sloanvalve.com
CUSTOMER SERVICE
ADJUST DRAIN TO ACHIEVE PITCH if
standing water is present (code requires ¼
drop per foot of drain line for proper pitch).
Seal wall according to code.
A. Hang the bowl on the bracket and check tail pipe
alignment, then remove the bowl and adjust the
bracket as needed.
Re-hang and re-check bowl alignment with the drain
line. Tail pipe should align with center of drain line.
B. Mark anchor holes then
remove bowl without moving
hanger bracket.
INCORRECT
Not centered
CORRECT
Centered
A
½" ¾"to
9" MAX.
for ADA
installation
standard 24" rim
finished floor
16"
Drain
6 
13 ⁄
21½
Cut away wall
Lift drain line & brace
with mending plate
21½
Install plastic anchor
and screw here
Install additional
screws here
11 10
12
A. Find the drain nipple depth on the
Tube Cutting Chart (left).
Measure and mark the specified
trim length on the insert tube at the
nearest ¼” groove.
B. at the groove using a sharp utility Cut the tube
knife to ensure a square, flat cut.
C. Clean burrs from the cut end by using emery
paper.
D. Apply lubricant to the outside of the rubber
bushing and ribbed inside area.
E. Insert the tube and bushing with arrow tab at
the top. Apply lubricant to tailpipe of housing.
Arrow
tab UP
1234
A
C
BD E
POUR 5
GALLONS
OF WATER
as rapidly
as possible
into housing
to ensure
good flow
and no leaks or
standing water.
CAULK THE BOWL TO
THE WALL.
INSTALL THE
CARTRIDGE
per the cartridge
instruction sheet.
CARTR IDG E
INSTRU C TIO N S
HANG THE BOWL, inserting
tailpipe into bushing, then install
anchor screws with washers.
TIGHTEN FLANGE BOLTS.
The information in this document is subject to change without notice.
©2018 Sloan Valve Company All rights reserved.
0816483 Rev. 5 (03-18)
sloan.com
CAUTION After removing any urinal from the
drain line, its normal for certain naturally occurring
but potentially hazardous sewer gases to escape
through the opening until the waterless cartridge
is installed properly into the waterless urinal. If you
need to leave an open drain line unattended after
removing the urinal from the wall, temporarily wedge paper towels or a
rag into the drain hole to reduce any outflow of sewer gases, and remove
the paper towels or rag prior to completing the urinal or cartridge
installation. Never smoke, have an open flame, or place your nose or
mouth near open drain lines or waterless urinal housings into which
a cartridge is not yet properly installed. You also can wear a breathing
mask when removing or installing any waterless urinal or cartridge to
reduce potential exposure to any such gases.
CARRIER STUD PLACEMENT If using
in-wall carrier, set bearing rods as shown
above.
B
essential because waterfree urinals depend on
gravity flow
Check DWV material. Suitable materials include
cast iron, PVC, ABS, and galvanized steel
Shut off water supply and cap the nipple with
the ¾" chrome cap (provided).
BEFORE STARTING INSTALLATION
WES-1000 WATERFREE URINAL
NEW CONSTRUCTION
INSTALLATION INSTRUCTIONS
IMPORTANT-Do not install on copper DWV due to copper’s
susceptibility to corrosion
ADA requires a lip height of 17” or lower. To
allow for variances and assure compliance Sloan
recommends roughing the drain line to achieve a
16-½ ” lip height.
Check slope. Downhill slope, per code, is B
15 16
4
14
7
3
13
9
6
2
11 1210
8
5
1
C D
2" side cutter blade
Cut away wall
Lift drain line & brace
with mending plate
Install additional
screws here
INCORRECT
Not centered
CORRECT
Centered
11 10
12
CAR TR IDG E
IN ONSTR UCTI S
Ar w ro
tab UP
1234
A
C
B D E
21½
Install plastic anchor
and screw here
15 16
4
14
7
3
13
9
6
2
11 1210
8
5
1
B
C D
A B
OR LESS TRIM
13 ¾" ¼"
13 ½ ½
13 ¼ ¾
13 1
12 ¾
12 ½
12 ¼
12 2
11 ¾
11 ½
11 ¼
11 3
10 ¾ 3 ¼
10 ½ 3 ½
OR SS TRIM LE
10 ¼" 3 ¾"
10 4
9 ¾ 4 ¼
9 ½ 4 ½
9 ¼ 4 ¾
9 5
8 ¾" 5 ¼
8 ½ 5 ½
8 ¼ 5 ¾
8 6
7 ¾ 6 ¼
7 ½ 6 ½
7 ¼ 6 ¾
7 7
OR LESS TRIM
6 ¾" 7 ¼
6 ½ 7 ½
6 ¼ 7 ¾
6 8
5 ¾ 8 ¼
5 ½ 8 ½
5 ¼ 8 ¾
5 9
4 ¾ 9 ¼
4 ½ 9 ½
4 ¼ 9 ¾
4 10
1-88 AN- )8-SLO 14 (888-756-2614
cus omet r.s e@sloanvalve.coervic m
CU TOME ICS R SERV E
CA N UTIO Aft r o n r ro he er em ving a y u inal f m t
dr n ine t’ or l fo cer atur ccu g ai l , i s n ma r tain n ally o rrin
but t e poten l zardou ew tia ly ha s s er gases o escap
thro i n h waterl rtri e ugh the open ng u til t e ess ca dg
is t r r nto water r l I you ins alled p ope ly i the less u ina . f
nee e n d to av le a o r unatt fter pen d ain line ended a
remo n rvi g the u inal f m the , edge pape els oro wall temporarily w r wto r a
ra int r n t reduc n ow o wg o the d ai hole o e a y out f se er gases r ove , and em
the paper towel os r r r r to c r rtridge ag p io ompleting the u inal or ca
in llasta tion. Nev oke, ave op ame, ce yo or er sm h an en or pla ur nose
mo h n ope dr e wut ear n ain lin s or ater al nt h less urin housings i o whic
a car d y roper d. tri ge is not et p ly installe You als n r o ac wea a reathb ing
ma em visk rwhen o n l n ter rg or instal ing a y wa less u inal o rtrid to r ca ge
reduc oten a ee p ti l xposur t n s.e o a y such gase
sloan alve.cov m
The information in this document is subject to change without notice.
©2014 Sloan Valve Company All rights reserved.
0816483 Rev. (03-1 )5 8
WES-1000 WATERFREE URINAL
RETRO-FIT
INSTALLATION INSTRUCTIONS
BEFORE STARTING INSTALLATION:
IMPORTANT - Do not install on copper DWV
due to copper’s susceptibility to corrosion.
.
TUBE CUTTING CHART
Measure drain nipple depth (in) to find trim
length (in)
13 7/8” or more DO NOT CUT
3 3/4” or less DO NOT USE TUBE
PLACE THE SEAL INTO THE
FLANGE with the ribs facing
out. Install the flange with
washers and hex nuts, but do
not tighten completely.
DRILL HOLES with
5/16” masonry bit for
the lower anchor
screws and insert
plastic anchors.
INSTALL THE GEAR
CLAMP with screw
head at bottom,
but do not tighten .
POUR 5
GALLONS OF
WATER as
rapidly as
possible into
housing to
ensure good
flow and no
leaks or
standing water. CAULK THE BOWL TO
THE WALL.
INSTALL THE
CARTRIDGE per the
cartridge instruction
sheet.
HANG THE BOWL inserting
tailpipe into brushing, then install
anchor screws with washers.
TIGHTEN FLANGE BOLTS.
A. Find the drain nipple depth on the Tube
Cutting Chart (left).
Measure and mark the specified trim length on
the insert tube at the nearest 1/4” groove.
B. Cut the tube at the groove using a sharp
utility knife to ensure a square, flat cut.
C. Clean burrs from the cut end by using emery
paper.
D. Apply lubricant to the outside of the rubber
brushing and ribbed inside area.
E. Insert the tube and brushing with arrow tab at
the top. Apply lubricant to tailpipe of housing.
MEASURE & MARK THE ROUGH-IN If in-wall
carrier is not used. Use a 5/16” masonry bit to
drill hole, then install the hanger bracket with
one plastic anchor and screw.
LEVEL THE BRACKET THEN MARK, drill and
install two additional plastic anchors and screws.
If pre-existing bearing rods can be used, screws
are not necessary.
A. Hang the bowl on the bracket and check tall
pipe alignment, then remove the bowl and
adjust the bracket as needed.
Re-hang and re-check bowl alignment with
drain line. Tail pipe should align with center or
drain line.
B. Mark anchor holes then remove
bowl without moving hanger
bracket.
DETERMINE THE DRAIN NIPPLE DEPTH by
measuring the distance between the back of the
sanitary tee (or elbow) to the front edge of the
nipple.
A. Clean face of existing wall flange.
B. Install the brass flange with the clean
inspection disc.
C. Slowly pour water into the drain.
D. Use a flashlight to check the pitch/slope.
There should be no water present in the
inspection disc or nipple.
E. Remove flange after inspection.
ADJUST DRAIN TO ACHIEVE PITCH If standing
water is present (code requires 1/4” drop per
foot of drain line for proper pitch). Seal wall
according to code.
USE UTILITY KNIFE TO CUT CAULK then use a
putty knife and mallet to remove the bowl.
Remove hanger brackets, scrape o caulk, and
clean the wall.
IMPORTANT: Use a drain machine to remove
build-up inside pipes. Clean up to 25 feet deep
then finish with water to remove cutting debris.
ADA requires a lip height of 17” or lower. To
allow for variances and assure compliance
Sloan recommends roughing the drain line to
achieve a 16-½ ” lip height.
Check rough-in height to achieve 24” rim
height (17” rim height for ADA).
Check slope. Downhill slope, per code, is
essential because of waterfree urinals depend
on gravity flow.
Check DWV material. Suitable materials include
cast iron, PVC, ABS, and galvanized steel.
Shut off water supply and cap the nipple with
the 3/4” chrome cap (provided).


Product specificaties

Merk: Sloan
Categorie: Toilet
Model: WES-1000

Heb je hulp nodig?

Als je hulp nodig hebt met Sloan WES-1000 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Toilet Sloan

Handleiding Toilet

Nieuwste handleidingen voor Toilet