Pulse ShowerSpas 1017 Handleiding
Lees hieronder de 📖 handleiding in het Nederlandse voor Pulse ShowerSpas 1017 (4 pagina's) in de categorie Douchekop. Deze handleiding was nuttig voor 57 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld
Pagina 1/4
Installation Instructions
Bonzai Rain Shower System
Model # 1017
Invigorate. Decorate. Rejuvenate.
C
ongratulations on your purchase of a Bonzai PULSE Showerspa. We take great pride
in the styling, quality and workmanship of this product. With proper installation and
care, your Showerspa will give you a showering experience like never before. Get
ready to start your day in a whole new way and FEEL THE PULSE!
Figure F
Pos. 1 Pos. 2 Pos. 3
Figure B
# Part Description Qty. # Part Description Qty.
1.
escutcheon base plate w/tape 1
15.
wall anchor pin/nail - (optional) 2
2.
½ inch x 2½ inch brass nipple 1
16.
handle 1
3.
90° connector w/cone washer 1
17.
handshower holder 1
4.
tapered plastic compression washer 1
18.
hexagon washer 1
5.
chrome finned compression nut 1
19.
stainless steel washer 1
6.
escutcheon cover
1
20.
#4 X 5/8" Philips head screw
1
7.
18 in.
(46 cm )
PVC supply line
1
21.
59 in.
(1.5M )
PVC handshower hose
1
8.
2.5gpm.
(9.5lpm )
flow restrictor
1
22.
4mm round handshower washer
2
9.
rubber washer with screen
1
23.
handheld shower w/check valve
1
10.
90
° Showerspa supply Inlet
1
24.
6mm round showerhead washer
1
11.
wall mount w/adhesive tape
2
25.
8 in.
(200m m )
rain showerhead
1
12.
#4 X 5/8". Philips head screw
4
26.
ABS shelf
1
13.
wall mount cover plate
4
27.
#4 X 1/2" Philips head screw
1
14.
mushroom wall anchor - (optional) 2
28.
"Optional" thin escutcheon 1
1280mm
77.1mm
470mm
49.2mm
Figure C
5mm hole
(3/16 inch)
Figure D
Figure E
Optional - drilled wall anchor
Figure A
28
1
2 3
22
6
4
5
7
8
9
11
12
13 14 15
17
11
12
13
14 15
16
18 19 20
21
22
23
24
25
26
27
10
Thank you for choosing the
Bonzai Rain Shower System Model #1017
By PULSE Showerspas Inc.
In
stallation of the Bonzai Rain Shower System is designed to be quick and easy. If you have any installation
issues or
performance problems, call
technical support toll free at 888-785-7320 or email support@pulseshowerspas.com before
returning this product
. For helpful installation video go to: http://www.pulseshowerspas.com/flash/bonzai_installation.html
Please read instructions carefully to become familiar with components
, installation procedures and tools required. [Figure A]
Follow steps in the order
presented to avoid mistakes
.
What
is needed: Philips screwdriver, adjustable wrench, level, pencil/marker, Isopropyl alcohol.
What may be needed
: Cordless drill, 3/16” inch (5mm) masonry/tile drill bit, hammer, hair dryer
Determine general mounting lo
cation: The Bonzai is designed to easily mount in virtually any shower or tub/shower configuration!
With
a two handled valve (separate handle for hot & cold) we suggest installing the Bonzai centered between the two handles. With a single
handle valve
, the Bonzai can be mounted above the valve (typical tub/shower configuration) or on either side of the valve. The unique pivoting
shower arm and adjustable body sprays ensure perfect positioning!
Getting started:
1.
Remove the showerhead and escutcheon (trim cover) from your existing shower arm.
2.
Determine minimum length NPT nipple (2) required:
a) Place a mark on existing shower arm at the wall surface.
b) Unscrew shower arm from elbow in wall.
c) Measure distance from mark made on shower arm to end of shower arm threads that were previously inserted in wall.
d) Add ½ inch to this measurement, and then round up to nearest ½ inch. (i.e. if measurement = 1¾ inches, add ½ inch = 2¼ inches, rounded up
to nearest ½ inch = 2½ inch NPT nipple. This is the minimum length required with maximum length to be plus 1 inch.
NOTE If supplied 2½ inch nipple (2) is not the correct length based on above formula, you must obtain correct size - sold separately. :
3.
Apply generous amount of Teflon tape and/or pipe sealant to nipple (2) and adequately tighten into elbow in wall to ensure no leaks. Do not damage
or mar final ½ inch of nipple threads protruding from wall.
4.
Insert rubber washer with screen (9) into hexagon fitting of supply line (7) and connect to 90° inlet (10). Do not over-tighten.
5.
Slide female wall mounts (11) over their male counterparts. [Figure B] NOTE: Do not remove covering on special adhesive tape!
6.
Hold Bonzai up to the wall and determine mounting location; evaluating showerhead and body spray heights making certain supply line (7) reaches
NPT nipple (2). Use a level to check for vertical (plumb) position. It is ideal to position entire surface area of mounts (11) on flat, non-porous surface.
(i.e. no grout lines or uneven surfaces.) Once confident of Bonzai’s position, mark the wall at top & bottom mounts (11) for reference.
7.
Mounting locations on wall must be thoroughly cleaned of all residues with a 50:50 mix of Isopropyl alcohol and water. The area must be
completely dry before adhering mounts to wall surface. Ideal application temperature is 70 F or above and no less than 60 F° ° .
8.
Remove covering of special adhesive tape on wall mounts (11) and carefully position Bonzai onto wall at predetermined location.
IMPORTANT: Apply a consistent firm pressure equal to 15psi against the wall surface for at least 1 minute.
NOTE: At 70 F approximately 50% of ultimate bond strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours. °
Ultimate bond strength can be achieved more quickly (and in some cases bond strength can be increased) by exposure of the bond to elevated
temperatures (e.g. 150ºF (66ºC) for 1 hour. A common hair blow dryer can be used to accelerate the cure time
9.
Carefully slide the Bonzai out of the female wall mounts while the tape bonds to wall surface. If using this drill-less installation technique, it is highly
recommended to wait at least 24 hours before continuing the installation (Step #12) or introducing any moisture.
10.
To further secure mounts (11) with nylon wall anchors (14) in solid surface walls (tile, marble, granite etc.) use a 3/16 inch (5mm) masonry/tile drill bit
and slowly drill a 1¼ inch (32mm) deep hole through existing hole of female mounts. CAUTION: live (active) plumbing is behind the wall!
NOTE: If mounting Bonzai with wall anchors through a fiberglass wall you must purchase appropriate type mounting anchors (Qty 2) for this type of
wall surface. – sold separately. PULSE does not recommend mounting through fiberglass wall surfaces without adequate wood or sheetrock backing!
11.
Insert nylon anchor (14) through the female mount (11) making sure mushroom head is seated firmly against mount and mount is firmly seated
against wall. Using a hammer, tap nail (15) into nylon anchor body until flush with nylon head. [Figure C]
12.
Remove covering of two faced tape on escutcheon base plate (1) and slide over nipple (2) securing base plate to wall. NOTE: Optional thin
escutcheon (28) is provided for installations where the ABS escutcheon (6) interferes with desired mounting height of Showerspa.
HINT: For best finished look when using thin escutcheon (28), nipple should only extend ½-¾ inch (12-19mm) from wall surface.
13.
Secure 90° connector with cone washer (3) to nipple. Do not over-tighten. [Figure D] NOTE: Cone washer is already installed on 90° connector.
14.
Insert Bonzai into wall mounts. Determine length of supply line (7). Supply line must install completely over barbed portion of 90° connector (3). To
shorten, remove Bonzai from wall and cut supply line with sharp utility knife.
15.
Re-insert Bonzai into wall mounts, slide compression nut (5) followed by tapered end of compression washer (4) over supply line hose (7). Push
hose onto barbed portion of 90° connector (4) and secure with compression washer and nut. Do not over-tighten. Push escutcheon cover (6) into
base plate (1). [See Figure E] HINT: Apply small amount of liquid soap to help hose slide onto barbed connection.
16.
Select mounting hole for required spacing from wall and secure with Philips head screws (12). Do not over-tighten. Insert chrome covers (13) into
mounts to hide screws. [See Figure F]
17.
Thread handle (16) into left side of hand shower mount. Align hanger (17) on right side followed by hexagon washer (18), round washer (19) and
secure with screw (20).
18.
Insert 4mm rubber washer (22) into each end of hand shower hose (21) and secure to Bonzai and hand shower (23).
19.
Insert 6mm washer (24) into shower head (25) and securely tighten to Bonzai.
20.
Carefully insert ABS shelf (26) into mounting bracket until tabs lock in place. Secure shelf to Bonzai body with Philips screw (27)
21.
You are now ready to enjoy your new Bonzai Rain Shower System by PULSE Showerspas, Inc.
Product specificaties
Merk: | Pulse ShowerSpas |
Categorie: | Douchekop |
Model: | 1017 |
Heb je hulp nodig?
Als je hulp nodig hebt met Pulse ShowerSpas 1017 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Douchekop Pulse ShowerSpas
27 Juli 2023
27 Juli 2023
27 Juli 2023
27 Juli 2023
27 Juli 2023
27 Juli 2023
27 Juli 2023
Handleiding Douchekop
- Douchekop Philips
- Douchekop IKEA
- Douchekop G3 Ferrari
- Douchekop GRE
- Douchekop Grohe
- Douchekop Grothe
- Douchekop Hansgrohe
- Douchekop Konig
- Douchekop Miomare
- Douchekop Mira
- Douchekop Teka
- Douchekop Conair
- Douchekop Coleman
- Douchekop Curaqua
- Douchekop Schütte
- Douchekop Dusar
- Douchekop Mora
- Douchekop Gustavsberg
- Douchekop Saniscape
- Douchekop SaniSupreme
- Douchekop Sanivo
- Douchekop Omnires
- Douchekop Toivo
- Douchekop Symmons
Nieuwste handleidingen voor Douchekop
25 November 2024
17 November 2024
15 Juli 2024
15 Juli 2024
15 Juli 2024
10 Juli 2024
10 Juli 2024
10 Juli 2024
10 Juli 2024
20 Juni 2024