HQ ALK-C-01 Handleiding

HQ Accu ALK-C-01

Lees hieronder de 📖 handleiding in het Nederlandse voor HQ ALK-C-01 (5 pagina's) in de categorie Accu. Deze handleiding was nuttig voor 55 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/5
Page 1 5 of
DELIVERY SPECIFICATIONS
Chemistry: A lkaline Manganese Dioxide Battery
Model No.: HQ ALK- -C- 01
Total pages: 5
(including this cover page)
Customer comment:
A Blkaline attery LR14/C
1 . Scope
This specification governs the performance of the following battery. Alkaline
model: LR14/C.
1.1 Designations:
14 IEC : LR
JIS : AM-2
C ANSI :
E93 Others :
2.2 Reference Document:
-- IEC 60086 Part 1: Genera-1 (2000-11): Primary Batteries – l
-- IEC 60086 Part 2: Physical and Electrical specification-2 (2001-10): Primary Batteries –
-- IEC 60086 Part 5: Safety of batteries with aqueous-5 (2000-07): Primary Batteries –
electrolyte.
2 . Ratings
Page 2 5 of
Items Specifications Remarks
Nominal Voltage N/A (V) 1.5
Nominal Capacity
(m Ah) 5000 Condition: load 3.9 , 24 h/day, at 20±2Ω,
RH 60±15 , end point voltage 0.9V
Chemical System Alkaline
Manganese Dioxide
Mercury or cadmium is not added in the battery.
Applications
Temperature () -10 ~ 4 0N/A
Typical Weight (g) 65 Approximate weight
Mechanical
Dimensions
See attached
Data Sheet N/A
3. Electrical Characteristics
Test conditions: load resistance 3.9-- Ω± 0.5%,
-- measuring time 0.3 seconds,
-- temperature at 20 ±2,
-- test carried out within 60 days after manufacture data.
A B /Clkaline attery LR14
Test Items - Volt Off Load
(V)
On- Load Volt
(V)
Flush Current
(A)
Test Criterion
New Battery 1.60 8.00 1.45
After 3 moths,
at 45 1.56 1.40 6.00
After 12 months at
room temperature 1.56 6.00 1.40
ISO2859-1: 1999
Class S-4, Once
Sampling, AQL
= 1.0
Page 3 5 of
4 . Service Output
Test conditions: temperature at 20-- ±2,
-- test to be carried out within 60 days after emanufactur data.
Discharge Condition Average Minimum Diss charge Time
Standard Discharge
load (Ω)
Discharge
Time
E.P.V.
(V)
New Battery
After 12 mo ths
at room temp
IEC 3.9 4min/h,8h/d 0.9 17 h 15.3 h
IEC 3.9 1h/d 0.8 17.5 h 15.8 h
IEC 6.8 1h/d 0.9 32 h 28.8 h
IEC 20 4h/d 0.9 100 h 90 h
Daily-max
3.9 24h/d 0.9 17 h 15.3 h
Satisfaction Standard:
1) 9 pieces of battery will be tested for each discharging standard;
2) The result of the average discharging time from each discharging standard shall be equal to or
more than the average minimum time requirement; no more than one battery has a service
output less than 80% of the specified requirement.
3) One re-test is allowed to confirm the previous result.
5. Electrolyte Leakage Proof Characteristics
Item Condition Period
Requirement Acceptance
Standard
Over-discharge
Characteristics
3.9 Ω continuous
discharge at temperature
20±2; relative humidity:
60±15% RH
48
hours
N = 9:
Ac = 0;
Re =1
Storage
Characteristics
Storage at temperature
60±2; relative humidity
below 90% RH
20
days
There shall be no
deformation exceeding
the specified
dimensions, nor
leakage recognized by
human eye.
N = 30:
Ac = 1;
Re = 2
A B lkaline attery LR6/AA
6. Safety Characteristics
Item Condition Period Requirement Acceptance Standard
Short- circuit
Characteristics
At temperature
20±2 24 hours No explosion
allowed
N = 5:
Ac = 0; Re = 1
Incorrect
Installation
4 pcs in series with 1
pc reverse polarized
( -5) IEC60086
24 hrs or till
battery casing
temp reaches
room temp
No explosion
allowed.
N = 4 x 5:
A c = 0; Re = 1


Product specificaties

Merk: HQ
Categorie: Accu
Model: ALK-C-01
Kleur van het product: Blue,White
Hoogte: 49.5 mm
Diameter: 25.5 mm
Accu/Batterij voltage: 1.5 V
Aantal inbegrepen batterijen: - stuk(s)
Form factor batterij: Cylindrisch
Batterijtechnologie: Alkaline
Type batterij: Wegwerpbatterij
Batterijgrootte(s): C

Heb je hulp nodig?

Als je hulp nodig hebt met HQ ALK-C-01 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Accu HQ

Handleiding Accu

Nieuwste handleidingen voor Accu

Bolt

Bolt CBP-U Handleiding

16 December 2024
Bolt

Bolt PP-5800BP Handleiding

13 December 2024
Bolt

Bolt PP-500DR Handleiding

13 December 2024
PAG

PAG MPL99 Handleiding

10 December 2024
PAG

PAG MPL50 Handleiding

10 December 2024
Apc

Apc RBC27 Handleiding

2 December 2024
Apc

Apc RBC24 Handleiding

2 December 2024
Apc

Apc RBC18 Handleiding

2 December 2024
Apc

Apc RBC44 Handleiding

2 December 2024