Growatt SYN 50-XH-30 Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Growatt SYN 50-XH-30 (2 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 2 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/2
1
1
1
11.
.
.
..
2
2
2
22.
.
.
..
SYN 50-XH-30 Quick Guide
Overview
Installation
System overview 2.2 Installation requirements
2.1 Electrical parameters
1 2 3 4 5 6 7
2
Note: The above dimensions are in "mm".
1 2 3 4 5 6 7 8 9
1
Screw torque
Power grid terminals
26.5 to 31 in*lbs
Ground terminal
13 in*lbs
Nomal Loads
Critical Loads
Interver
Battery
Meter
Bakup
Box
CT
Communica tion cable
Power cable
≤15°
≥300
≥300
≥300
≥500
365.0
486.3
92.5
134.7
120.2
Note:
The critical load power depends on the power rating of
the inverter and battery
3
SYN 50-XH-30
Grid
Grid
PE NL3 L2 L1 L1 L2 L3 N
PE
L1 L2 L3 N L 1 L2 L3 N L1 L 2 L3 N L 1 L2 L3 N
GR ID BY PASS IN VE RT ER LO AD
Model name
SYN 50-XH-30
Nominal grid
voltage
3W/N/PE
230/400 a.c.V
Range of grid
voltage
312 485 a.c.V~
Max. grid
current
63 a.c.A
Max.
continuous
grid current
50 a.c.A
Nominal grid
frequency
50/60Hz
Range of grid
frequency
45 65Hz~
Max.
continuous
inverter input
current
26.1 a.c.A
Max. backup
output current
26.1 a.c.A
(1)Front panel (2)LED indicator (3)Screw for front panel (4)Mounting bracket
(9)Waterproof plugs
( ) 5 Grid wiring port
( )6 Inverter wiring port ( ) 7 Load wiring port ( )8 COM wiring port
2.3 Installation steps
1.Choose a suitable installation position. The SYN 50-XH-30 can be mounted on a solid wall, a stud
framing or a pole and keep it free from direct sunlight.
2.To ensure heat dissipation, please maintain at least a 300mm clearance between the SYN 50-XH-30
and other objects.
3.Place the mounting bracket against the wall/pole and mark the drilling hole positions.
4.Drill holes and mount the bracket. Ensure that the bracket is securely installed.
5.Install the SYN 50-XH-30 onto the mounting bracket.
Dimensions (Unit: mm)
2 4. Required tools
No.
Name
Size
No.
Size
1
Flat-blade
screwdriver
Φ2&5mm
2
/
3
Allen wrench
Φ5mm
4
Φ5mm
5
Electric drill
Φ6mm
6
/
7
Pliers
/
3
3
3
33.
.
.
..
Recommended cable specifications
The cable specifications of this SYN 50-XH-30 are as follows, and the stripped length of the cable is 10mm.
Cable
Cable outer
diameter
Cable length
Grid input cable
6-8AWG
10m
Inverter input cable
8-12AWG
20m
Load output cable
8-12AWG
20m
Communication cable
22-26AWG
20m
6-8AWG
10m
L
10mm
10m
6-8AWG
6-8AWG
N
10mm
10m
PE
10mm
Grid AC cable
20m
8-12AWG L
10mm
20m
8-12AWG
8-12AWG
N
10mm
20m
PE
10mm
Load and lnverter AC cable
20m
20m
22-26AWG
22-26AWG
L
10mm
N
10mm
Commun ication cable
3 1. Wiring instructions
3.1.1 Connecting SYN 50-XH-30 to the Grid
1.Remove the two screws on the upper cover of the SYN 50-XH-30 to open the upper cover, and do
not remove the cover inside the machine.
2.Twist the plastic cover printed with "Grid" counterclockwise, remove the five waterproof plugs, and
reserve five holes.
3.Route the five power grid cables (L1/L2/L3/N/PE) through the five holes and connect them to the
power grid input terminals and the ground copper bar. Screw torques for tightening the power grid
terminals and ground terminals are shown in the following table.
4.Finally, fasten the plastic cover clockwise. The wiring method is shown in Figure 3.
Note:PE cables needs to be crimped with the O-type
terminal in the accessory bag, as shown in Figure 2.
Connecting to the Grid
3.1.2 Connecting SYN 50-XH-30 to the Inverter
When connecting the SYN 50-XH-30 to the XH Inverter, we need to connect the AC power cables and the communication cables.
GR-UM-272-A-00
Download
Manual
Growatt New Energy
COM Port
XH Inverter
COM
SYN 50-XH-30
COM
RS485 A
PIN 17
PIN 3
RS485 B
PIN 18
PIN 4
BOX.EN+
PIN 21
PIN 5
BOX.EN-
PIN 22
PIN 6
Screw torque
Inverter circuit breaker terminals
17.5 in*lbs
Ground terminal
13 in*lbs
Screw torque
Load breaker terminal
17.5 in*lbs
Ground terminal
13 in*lbs
L1L2 L3 N
Inverter
PE
ON
ON
ON
ONON
OFF
OFF
OFF
OFFOFF
NL3L 2 L 1PE
Inverter
SYN 50-XH-30
L1 L2 L3 N L 1 L2 L 3 N L1 L 2 L3 N L 1 L2 L3 N
GR ID BY PASS IN VE RTE R LO AD
COM
BOX.EN-
BOX.EN+
B
A
CN8
InverterSYN 50-XH-30
1
6
COM
L1 L2 L3 N L 1 L2 L 3 N L1 L2 L3 N L1 L 2 L 3 N
GR ID BY PASS IN VE RTE R LO AD
Load
L1L2 L3 N
NL3L 2 L 1PE
PE
Backup Loads
SYN 50-XH-30
L1 L2 L3 N L 1 L2 L 3 N L1 L2 L 3 N L1 L 2 L3 N
GR ID BY PASS IN VE RTE R LO AD
3.1.2.1 AC power cable connection:
3.1.2.2 Communication cable connection:
1.Twist the plastic cover printed with "Inverter" counterclockwise;
remove the five waterproof plugs, and reserve five holes.
2.Route the five cables of the inverter (L1/L2/L3/N/PE) through
the five holes, connect the cables to the inverter breaker terminals
(L1/L2/L3/N) and the ground copper bar. Screw torques for
tightening the inverter breaker terminals and ground terminals are
shown in the following table.
3.Finally, fasten the plastic cover clockwise. The wiring method is
shown below:
1.Twist the plastic cover printed with "COM" on the machine
Counterclockwise; remove the waterproof plug, and reserve one
hole.
2.Route the two communication cables (A/B) (the twisted pair cable
are recommend) and the two BOX EN cables (EN+/EN-) through the
hole, connect them to the CN8 terminals on the control board,
connect the other end of the cables to the COM terminals of the
inverter, and tighten the screws. The following table lists the
corresponding terminal pins. The wiring method is shown as follows:
Connecting the communication cables to the XH Inverter
Connecting the AC cables to the XH Inverter
3.1.3 Connecting SYN 50-XH-30 to the load
1.Twist the plastic cover printed with "Load" counterclockwise,
remove the five waterproof plugs, and reserve three holes.
2.Route the five load cables (L1/L2/L3/N/PE) through the five holes,
connect them to the load circuit breaker terminals(L1/L2/L3/N) and
ground copper bar. Screw torques for tightening the load breaker
terminals and ground terminals.
3.Finally, fasten the plastic cover clockwise. The wiring method is
shown on the right:
Connecting to the AC Loads
4
4
4
44.
.
.
.. Indicator Description
System state
indicator status
Green
Red
On-grid Mode
On
Off
Back-up Mode
Blinking on 1s,off 1s,
Off
No communication with the inverter
Off
Blinking on 1s,off 1s,
System fault
Off
On
Firmware upgrade
When the upgrade starts, the yellow light is on or off for 10-20s, and then the yellow
light blinks at intervals of 2s(on for 1 second and off for 1 second).
5
5
5
55.
.
.
.. System startup and shutdown operations
5 1. To start the system, please perform the following steps:
5 2. To shut down the system, please perform the following steps:
Shenzhen Growatt New Energy CO.,LTD
4-13/F, Building A, Sino-German(Europe)Industrial Park,
Hangcheng Ave, Bao’an District, Shenzhen, China
+86 0755 2747 1942
www.ginverter.com
T
E service@ginverter.com
W
7
7
7
77.
.
.
..
Service and contact
1.Disconnect the Inverter input breaker and the load input breaker on the SYN 50-XH-30 and then disconnect the power grid switch.
2.Turn off the DC switch of the inverter.
3.Turn off the DC switch of the battery.
4.Wait for a while and all the indicators of the inverter, the battery, and the SYN 50-XH-30 will go off, indicating that the system is powered
off completely.
6
6
6
66.
.
.
..
Transfer to the bypass mode manually
When SYN 50-XH-30 s is faulty, it cannot transfer to the bypass mode automatically. In order to ensure uninterrupted power supply to loads,
the bypass mode can be initiated manually.
1.Shut down the entire system. For details, please refer to section 5.2.
2.Use a Phillips screwdriver to loosen the limit switch screws on the power bypass switch.
3.Slide the firmware to one end of the inverter switch.
4.Tighten the screws on the limit switch with a torque of 10.5 in* lbs / 1.2 N*m. Turn on the power bypass switch. The operation instruction
s are shown below.
5.Power on the entire system. For details, please refer to section 5.1.
The operation is as follows:
1.Turn on the DC switch of the battery. For details, please refer to the battery manual.
2.Turn on the DC switch of the inverter. For details, please refer to the XH inverter manual.
3.Turn on the inverter input breaker of the SYN 50-XH-30, and observe whether the inverter and battery indicators are displayed. If yes,
move on to the next step. If the indicators are not displayed, it means that there is no mains supply. You need to press and hold the
POWER button of the battery for a long period to wake up the battery. Please refer to the battery installation manual.
4.If the backup box is connected, please enable the Backup Box via inverter settings. For details, please refer to the Chapter 9.3.3 in the
manual of Inverter.
5.Turn on the grid switch.
6.If the SYN 50-XH-30 indicator light turns green after completing the preceding steps, it indicates that the SYN 50-XH-30 is functioning
properly.
7.If you cannot power on the system with the instructions provided above, please contact Growatt.
Bypass Inverter Load Bypass Inverter Load Bypass Inverter Load


Product specificaties

Merk: Growatt
Categorie: Niet gecategoriseerd
Model: SYN 50-XH-30

Heb je hulp nodig?

Als je hulp nodig hebt met Growatt SYN 50-XH-30 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Growatt

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd