CyberPower RB1290X6A Handleiding
CyberPower
Accu
RB1290X6A
Lees hieronder de 📖 handleiding in het Nederlandse voor CyberPower RB1290X6A (2 pagina's) in de categorie Accu. Deze handleiding was nuttig voor 12 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld
Pagina 1/2
Battery Replacement
Instructions
Smart App Online RT 1-3KVA Series
MODEL: OL1000RTXL2U, OL1500RTXL2U, OL2200RTXL2U,
OL3000RTXL2U, OL3000RTXL2UHV, OL1000ERTXL2U,
OL1500ERTXL2U, OL2000ERTXL2U, OL3000ERTXL2U,
OL1000RT JP, OL1500RT JP, OL2200RT JP, OL3000RT JP
2. Remove the screws securing the battery retention panel.
3. Pull the battery pack out together with the retention panel slowly
and then put the new battery pack back into the UPS.
1. Remove the front faceplates.
4. Reconnect the battery pack connectors to the UPS. Then tighten the
screws of the battery retention panel.
5. Reinstall the front faceplates.
1
3 4
5
2
2. Remove the screws securing the battery retention panel.
3. Pull the battery pack out together with the retention panel slowly
and then put the new battery pack back into the UPS.
1. Remove the front faceplates.
4. Reconnect the battery pack connectors to the UPS. Then tighten the
screws of the battery retention panel.
5. Reinstall the front faceplates.
Smart App Online Tower 1-3KVA Series
MODEL: OL1000XL, OL1500XL, OL2200XL, OL3000XL, OL1000EXL,
OL1500EXL, OL2000EXL, OL3000EXL, OL1000XL JP,
OL1500XL JP, OL2200XL JP, OL3000XL JP
1
4 5
2 3
2. Remove the screws securing the battery retention panels.
3. Pull the battery packs out together with the retention panels slowly
and then put the new battery packs back into the EBM.
1. Remove the front faceplates.
4. Reconnect the battery pack connectors to the EBM enclosure. Then
tighten the screws of the battery retention panel.
5. Reinstall the front faceplates.
Smart App Online EBM for RT 1-1.5KVA Series
MODEL: BP36V60ART2U, BPE36V60ART2U, BPE36V60ART2US
21
43
5
K01-0000459-01
Smart App Online EBM for RT 2-3KVA Series
MODEL: BP72V60ART2U, BPE72V60ART2U, BPE72V60ART2US
2. Remove the screws securing the battery retention panels. Unscrew the
battery connector retention hardware. Disconnect the battery power
cables and then remove the panel itself.
3. Pull the battery packs out slowly and then put the new battery
packs back into the compartment.
1. Remove the front faceplates.
5. Reinstall the front faceplates.
4. Reconnect the battery pack to the EBM enclosure and screw on the
battery connector retention hardware. Tighten the screws of the battery
retaining cover.
WARNING - It is very important to reconnect battery connections with the correct
polarity. Connectors are color coded red and black for positive and negative
polarity respectively. Permanent damage may be caused to the equipment if
polarity is reversed.
21
3
5
4
Smart App Online RT 6-10KVA Series
21
43
5
MODEL: BP240V30ART3U, BP240V50ART3U, BPE240V30ART3U,
BPE240V50ART3U,BPE240V30ART3US,
BPE240V50ART3US
2. Remove the screws securing the battery retention panel.
3. Raise the battery retention panel above the battery compartment
opening to allow the battery trays to be pulled out. Then put the new
battery trays into the compartment.
1. Remove the front faceplates.
4. Align and reconnect the battery connectors and tighten the screws of the
battery retention panel.
5. Reinstall the front faceplates.
Smart App Online Tower 6-10KVA Series
21 3
54 6
MODEL: OL6000, OL8000, OL10000, OL6000E, OL8000E, OL10000E
2. Remove the screws securing the battery retention panel.
3. Raise the battery retention panel above the battery compartment
opening to allow the battery trays to be pulled out.
1. Remove the front faceplates.
4. Pull the battery trays out slowly and then put the new battery trays back
into the compartment.
5. Reconnect the battery connectors and tighten the screws of battery
retention panel.
6. Reinstall the front faceplates.
CyberPower Systems, Inc.
www.cyberpower.com
For USA and Canada:
4241 12th Ave East, Suite 400
Shakopee, MN 55379
Toll-free: (877) 297-6937
For all other regions:
Please visit our website for local contact information.
Replacement Battery Pack Table
Model Name Battery QTY UPS or EBM Model
RB1290X3L
OL1000RTXL2U
OL1500RTXL2U
BP36V60ART2U (LEFT)
3
3
3
6
6
6
10
10
RB1290X3R
RB1290X3A
RB1290X6A
RB1290X6B
RB1290X6C
BP36V60ART2U (RIGHT)
OL1500XL
OL2200RTXL2U
OL3000RTXL2U
OL3000RTXL2UHV
BP72V60ART2U
OL3000XL
6RB1270X6 OL2200XL
RB1290X10
BP240V50A
BP240V50ART3U
OL8000
OL10000
RB1270X10
BP240V30A
BP240V30ART3U
OL6000
Product specificaties
Merk: | CyberPower |
Categorie: | Accu |
Model: | RB1290X6A |
Kleur van het product: | Zwart |
Gewicht: | 15966 g |
Breedte: | 238 mm |
Diepte: | 482.6 mm |
Hoogte: | 83.8 mm |
Gewicht verpakking: | 18597 g |
Breedte verpakking: | 304.8 mm |
Diepte verpakking: | 614.6 mm |
Hoogte verpakking: | 177.8 mm |
Capaciteit van de accu/batterij: | 9000 mAh |
Accu/Batterij voltage: | 12 V |
Compatibele producten: | OL2200RTXL2U, OL3000RTXL2U, OL3000RTXL2UHV |
Aantal inbegrepen batterijen: | 6 stuk(s) |
Compatibiliteit: | OL2200RTXL2U, OL3000RTXL2U, OL3000RTXL2UHV |
Bedrijfstemperatuur (T-T): | 0 - 40 °C |
Relatieve vochtigheid in bedrijf (V-V): | 0 - 90 procent |
Batterijtechnologie: | Sealed Lead Acid (VRLA) |
Heb je hulp nodig?
Als je hulp nodig hebt met CyberPower RB1290X6A stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Accu CyberPower
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
21 September 2024
20 September 2024
20 September 2024
20 September 2024
6 September 2024
Handleiding Accu
- Accu Bosch
- Accu Sony
- Accu Panasonic
- Accu Nikon
- Accu Epson
- Accu LG
- Accu Huawei
- Accu Canon
- Accu DeWalt
- Accu JVC
- Accu A-solar
- Accu Abus
- Accu Aluratek
- Accu Ansmann
- Accu Apc
- Accu Arris
- Accu Belkin
- Accu BlackVue
- Accu Digitus
- Accu DJI
- Accu Einhell
- Accu Energizer
- Accu Fein
- Accu Fluke
- Accu Fujifilm
- Accu Fuxtec
- Accu Gardena
- Accu Greenworks
- Accu Hama
- Accu Hikoki
- Accu Hikvision
- Accu HQ
- Accu Husqvarna
- Accu Kensington
- Accu Kress
- Accu Leica
- Accu McCulloch
- Accu Mestic
- Accu Metabo
- Accu Milwaukee
- Accu Monacor
- Accu Nedis
- Accu Neewer
- Accu Parkside
- Accu Powerplus
- Accu Ranex
- Accu Ryobi
- Accu Sennheiser
- Accu Skil
- Accu Stiga
- Accu Stihl
- Accu Stinger
- Accu Targus
- Accu Toa
- Accu Toolcraft
- Accu Trust
- Accu Variotek
- Accu Varta
- Accu Vetus
- Accu Vonroc
- Accu Watson
- Accu Worx
- Accu Xtorm
- Accu Zipper
- Accu Ozito
- Accu Black And Decker
- Accu Sandberg
- Accu Shure
- Accu Nitecore
- Accu Petzl
- Accu Cocraft
- Accu Carat
- Accu Hilti
- Accu Conrad
- Accu Cobra
- Accu Biltema
- Accu Cramer
- Accu EGO
- Accu Techly
- Accu Deltaco
- Accu Scosche
- Accu Cortina
- Accu Duracell
- Accu PNY
- Accu Tripp Lite
- Accu Valcom
- Accu Whistler
- Accu Victron Energy
- Accu Energenie
- Accu Thomann
- Accu SKROSS
- Accu Growatt
- Accu Lenmar
- Accu Hähnel
- Accu Berg
- Accu Speed-Link
- Accu For_Q
- Accu Genaray
- Accu Wentronic
- Accu Anton/Bauer
- Accu Impact
- Accu Arctic Cooling
- Accu Crestron
- Accu Bolt
- Accu Team Orion
- Accu SolarEdge
- Accu Venom
- Accu Inovonics
- Accu Anova
- Accu Red Power
- Accu Sungrow
- Accu Ultron
- Accu Enphase
- Accu E-flite
- Accu PowerDrive
- Accu LSI
- Accu Renata
- Accu Fxlion
- Accu PowerBass
- Accu SOUNDBOKS
- Accu FeinTech
- Accu Verico
- Accu Levolta
- Accu HART
- Accu APSystems
- Accu TCW Technologies
- Accu Enerdrive
- Accu Tecnoware
- Accu Ventev
- Accu PAG
Nieuwste handleidingen voor Accu
16 December 2024
13 December 2024
13 December 2024
13 December 2024
10 December 2024
10 December 2024
2 December 2024
2 December 2024
2 December 2024
2 December 2024