Crestron SW-FUSION-EM Handleiding


Lees hieronder de πŸ“– handleiding in het Nederlandse voor Crestron SW-FUSION-EM (10 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 176 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/10
csi_26_09_13_electrical_power_monitoring.doc - 1 26 09 13
SECTION 26 09 13
ELECTRICAL POWER MONITORING
Specifier: The Specifier/Design Professional is responsible for the accuracy of all project specifications,
including system application and coordination with related sections. This guide specification is provided
as a convenience and requires editing to match actual project requirements. CRESTRON ELECTRONICS,
INC. SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE
SPECIFICATIONS. For Crestron design assistance and design review please contact Sales Support Ser-
vices Department at 800.237.2041 or techsales@crestron.com.
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
P ower meter unit integrated with the following:
Specifier: Edit paragraph to correspond to components and features required for this Project.
1. Automation and control server.
2. Electrical breaker panel.
3. Network power switching controls.
4. Network lighting controls.
5. Network management and control systems.
B. Related Requirements:
Specifier: Related Information paragraph is optional. If retaining, edit and coordinate list of sections
below to correspond to Project requirements.
1. Division 25 Section "Integrated Automation Software for Control and Monitoring
Networks" for software and integration hardware for network automation and
monitoring controls.
2. Division 25 Section "Integrated Automation Controls" for software and integration
hardware for network lighting controls.
3. Division 25 Section "Integrated Automation Network Equipment".
4. Division 26 Section "Common Work Results For Electrical".
5. D ivision 26 Section β€œProgrammable Controllers”.
6. Division 26 Section β€œDigital Network Lighting Controls”-
7. Division 26 Section "Wiring Devices".
1.2 REFERENCES
A. California Energy Commission (CEC):
1. CEC CCR Title 24, Part 6: California Energy Efficiency Standards for Residential
and Nonresidential Buildings, California's Appliance Efficiency Program: Listed
lighting control devices.
csi_26_09_13_electrical_power_monitoring.doc - 2 26 09 13
B. National Fire Protection Association (NFPA):
1. NFPA 70 National Electrical Code.-
C. Underwriters Laboratories (UL):
1. UL 916 – Energy Management Equipment.
D. National Electrical Code (NEC):
1. NEC Article 410.134 Direct Current Equipment.–
E. ABBREVIATIONS:
1. BAS: Building Automation System.
2. AV: Audio Visual.
3. RF: Radio Frequency.
4. CT: Current Transformer.
1.3 SYSTEM DESCRIPTION
Specifier: Edit description below to correspond to Project requirements.
A. Power metering system integrated with lighting, building automation, and Audio- Visual
systems utilizing a single control protocol and network infrastructure.
1. ower meter P system with central master control processor integrates the following
controls:
a. Native communication with building wide Audio Visual systems control
network.
b. Emergency Lighting Control when used with UL 924 devices.
c. Multiple Lighting Control Systems.
d. Touch panel controls.
e. Window treatment controls.
f. Timed room lighting.
g. HVAC controls.
h. Centralized facility management server:
1) Web- - -accessible, network connected, Windows based lighting
management software running on a Microsoft Exchange Server
communicating over TCP/IP networks to provide lighting and window
shade control, daylight harvesting, load shedding, occupancy sensing,
and occupied/unoccupied lighting schedules.
2) Store, evaluate and report power usage data.
i. Building Management Systems Interface – Direct communications through
master controller with BACnet, Modbus, LonWorks and Metasys
management protocols.
B. Unified System Integration – Controller supports native communication protocol utilized
by the lighting and AV control systems.
csi_26_09_13_electrical_power_monitoring.doc - 3 26 09 13
1. Communication protocol adaptors or translation interfaces between energy
management devices, energy management servers, lighting control systems, and
AV control systems will not be accepted.
1.4 ACTION SUBMITTALS
Specifier: Action submittals require responsive action by A/E or Owner.
A. Product Data: For each type of product required for energy metering system,
demonstrating compliance with requirements.
B. Shop Drawings: Indicate the following:
1. Schematic diagram of controlled -and non controlled circuits and peripherals.
2. Circuits and emergency circuits with capacity and phase, control zones, load type
and voltage per circuit.
1.5 INFORMATIONAL SUBMITTALS
Specifier: Informational submittals require review, but not response, by A/E or Owner. Edit list below
based on project requirements.
A. Buy American Act certificate.
B. CEC CCR Title 24 appliance efficiency listing certification.
C. Sample of manufacturer's warranty.
1.6 CLOSEOUT SUBMITTALS
A. Operating and maintenance instructions.
1.7 QUALITY ASSURANCE
A. Source Requirements: Provide lighting control, and power metering hardware and
software through a single source from a single manufacturer.
B. Manufacturer Qualifications:
Specifier: Retain paragraph below if Owner allows substitutions but requires strict control over qualifying
of substitutions.
1. Approval of Comparable Products: Submit the following in accordance with project
substitution requirements, within time allowed for substitution review:
a. Product data indicating compliance with requirements of this Section.
b. Samples of each component.
c. Sample submittals from similar project.
d. Project references: Minimum of 5 completed installations, with Owner and
Architect contact information.
e. Sample warranty.
2. Substitutions following award of contract are not allowed except as stipulated in
Division 01 General Requirements.


Product specificaties

Merk: Crestron
Categorie: Niet gecategoriseerd
Model: SW-FUSION-EM

Heb je hulp nodig?

Als je hulp nodig hebt met Crestron SW-FUSION-EM stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Crestron

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd