Baracuda Chlor Control Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Baracuda Chlor Control (4 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 42 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/4
Chlor Control
Semi-Automatic Liquid Chlorine Feeder
Installation & Operating Instructions
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CHEMICAL
DOSING SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.
2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
Baracuda® Chlor Control Semi-Automatic Liquid Chlorine Feeder | Installation and Operating Instructions
5
Section 2. System Overview
2.1 Contents
Before starting, check that you have the correct parts as shown in Figures 1 and 2. If any parts are
missing or incorrect, please call your local distributor or technical support at 1300 186 875 for
assistance.
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CHEMICAL
DOSING SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.
2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
1
6
2
3
4
5
Figure 1. Baracuda Chlor Control Kit Contents
Description Quantity
1 Baracuda Chlor Control 1
2 Injection Point Body 1
3 Gland Grommet 1
4 Gland Washer 1
5 Gland Nut 1
6 Vent Kit 1
NOTE: The vent kit is supplied with 4 meters of clear tube which needs to be cut to the required length to suit the
installation.
NOTE: “Installing the Vent Two lids are supplied with the kit to suit either a 25/15 ltr or a 5 ltr container. (See also
Kit” Section 4.2.)
Baracuda® Chlor Control Semi-Automatic Liquid Chlorine Feeder | Installation and Operating Instructions
8
4.3 Placement of Chemicals
To avoid potential corrosion issues, the liquid
chlorine drum shouldn’t be placed underneath
any equipment.
Correct Installation Incorrect Installation
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CHEMICAL
DOSING SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
THE TRUSTED NAME IN POOL CARE
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CHEMICAL
DOSING SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
THE TRUSTED NAME IN POOL CARE
Figure 5. Chemical Placement
4.4 Placement of Control Unit
If the Baracuda Chlor Control is installed
in an enclosure or shed, the liquid chlorine
drum should ideally be stored out side of the
enclosure or shed.
The Baracuda Chlor Control needs to be kept
away from the elements to protect the longevity
and function of the components.
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CH EMICA L
DOSIN G SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.
2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
THE TRUSTED NAME IN P OOL CARE
10
9
8
7
6
5
0
1
D
E
C
R
E
A
S
E
I
N
C
R
E
A
S
E
CH EMICA L
DOSIN G SYSTEM
MAINTENANCE:
1. Lubricate squeeze tube every 6 months with
RC tube lube.
2. Clean injection point periodically
3. Squeeze tube may need to be replaced
every 12 - 18 months
THE TRUSTED NAME IN P OOL CARE
Figure 6. Baracuda Shelter Requirements
The flexible tube from the liquid chlorine drum
must be connected to the left-hand barb of the
Baracuda Chlor Control and the tube to the
pool is connected to the right-hand barb. Cut a
suitable length of flexible tubing to run from the
liquid chlorine drum to the Chlor Control unit.
To connect the Baracuda Chlor Control to the
dosing tubes, slide a clamping nut onto each
tube (as shown in Figure 4) and push the tube
onto the barb. Slide the clamping nut up the
tube and hand tighten it onto the pump.
7
1
MA INT ENA NC E:
1. L ubri cate squ eeze tu be ever y 6 mon ths wi th
RC tube l ube.
2. C lean injecti on p oint perio dical ly
3. S queeze tube may need to b e repl aced
every 12 - 18 m onths
THE TRUSTED NAME IN POOL CARE
Figure 4. Baracuda Tubing Connections
From Chemical Drum
To Injection Point
To Pool
Line
To Pool
Line
Chemical
Drum


Product specificaties

Merk: Baracuda
Categorie: Niet gecategoriseerd
Model: Chlor Control

Heb je hulp nodig?

Als je hulp nodig hebt met Baracuda Chlor Control stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Baracuda

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd