990-0374A revision 2 11/01
This a dendum does not apply to Ba k-UPS P o 1000/1400 and Smart-UPS V/S 1000/1400d c r
I.Installation
Follow the installation illustration on the accompanying sheet.
Note: Small sparks at the battery connectors are normal during connection.
II. Post-Installation
Once installed,
allow the unit to charge for five hours. If the unit is an XL model, allow it to charge for
24 hours.
Note: The Smart-UPS will charge whether it is on or off, and will charge whether there is a load
present or not. In situations where the power quality is poor, it is recommended that the unit be
shutdown during this charging period. A Smart-UPS that is powered on may switch to battery
operation which would prolong the time needed to fully recharge the battery.
III. Clearing the Replace Battery LED
A. In order for the replace battery LED validto be cleared, it is necessary to run a self test. For a self test
to be considered valid, the following conditions must be satisfied:
â– battery capacity must be greater than 75%(minimum of four battery bar graph LEDs illuminated)
or
â– Smart-UPS must have been charging for at least 8 hours from the last low battery condition. (Low
battery condition refers to a state when the Smart-UPS battery has fully discharged).
B. Ways to initiate a self test
A self test can be initiated in any one of five ways:
â– Start up of the UPS
â– Smart-UPS front panel test button
â– Powerchute PLUS software
â– SmartSlot Accessory
â– Automatic timer- every two weeks from turn on (see APC owners manuals for details)
IV. Verifying Operation
A. What happens during a self test?
When a self test is initiated, the unit supports the load while operating on battery for approximately
8-10 seconds. During this period, the Smart-UPS determines the health of the battery.
B. When should the self test be performed?
After the unit has charged for five hours, a self test can be performed.
Replacement Battery Cartridge(RBC) Addendum
RBC5, RBC6, RBC7, RBC8, RBC9, RBC11, RBC12, RBC22, RBC23, RBC24, RBC25,
RBC27, RBC28, RBC5I, RBC6I, RBC7I, RBC8I, RBC9I, RBC11I, RBC12I, RBC22I,
RBC23I, RBC24I, RBC25I, RBC5J, RBC6J, RBC7J, RBC8J, RBC11J, RBC12J,
C. What happens when the replace battery LED does not clear?
If the self test fails:
â– If the battery capacity is greater than 75%, turn the unit off and restart it. When you turn a Smart-
UPS on, it will initiate a self-test. After the test completes, the LED should clear.
â– If the unit fails the self-test again, contact APC Customer Support (email: support.apcc.com or
phone: 800-800-4APC).
V. Increasing ‘Runtime Remaining’ of the Smart-UPS as viewed through Powerchute
PLUS or SmartSlot Accessory and prevent premature Low Battery Signal
Discharging and recharging a Smart-UPS resets the microprocessor to properly read battery voltage.
An accurate measurement is important when calculating the runtime remaining value appearing in
Powerchute PLUS or SmartSlot Accessory.
A. Initiating a runtime calibration
The runtime calibration option is accessible using Powerchute PLUS software or an APC SmartSlot
Accessory. Once the battery capacity reaches 100%, select this option. The unit will run on battery until
battery capacity is 25%. At that point, the unit will return to utility power and begin recharging itself. If
the runtime as seen through Powerchute PLUS or SmartSlot Accessory does not increase, then follow
the instructions in the next section.
Note: APC recommends that a runtime calibration be initiated once every six months at a maximum.
B. Disconnect from utility
By disconnecting the UPS from utility, a premature low battery signal can be prevented. It is recom-
mended that the power to the circuit be turned off at the distribution panel. Unplugging the Smart-UPS
from the outlet is not recommended.
Note: The Smart-UPS will run on battery until it discharges completely, turning off the load. It is not
necessary to discharge completely. Power can be restored to the unit once it reaches low battery
condition(see owner’s manual for details on how to identify low battery condition).
If experiencing low runtime or premature low battery signal issues, contact APC Customer Support
(email: support.apcc.com or phone: 800-800-4APC).
Product specificaties
Merk: | Apc |
Categorie: | UPS |
Model: | RBC9 |
Gewicht: | 4950 g |
Afmetingen (B x D x H): | 94 x 129.5 x 149.9 mm |
Bedrijfstemperatuur (T-T): | 0 - 40 °C |
Relatieve vochtigheid in bedrijf (V-V): | 0 - 95 procent |
Batterijtechnologie: | Sealed Lead Acid (VRLA) |
Code geharmoniseerd systeem (HS): | 85044095 |
Heb je hulp nodig?
Als je hulp nodig hebt met Apc RBC9 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding UPS Apc
16 November 2024
12 November 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
12 Oktober 2024
Handleiding UPS
- UPS HP
- UPS IKEA
- UPS AEG
- UPS Siemens
- UPS Dell
- UPS Digitus
- UPS Eaton
- UPS Emerson
- UPS Furman
- UPS Gembird
- UPS Gys
- UPS Lenovo
- UPS LevelOne
- UPS Riello
- UPS Schneider
- UPS Voltcraft
- UPS Jung
- UPS Steren
- UPS Conceptronic
- UPS Tripp Lite
- UPS Approx
- UPS Block
- UPS LC-Power
- UPS Energenie
- UPS CyberPower
- UPS Adj
- UPS East
- UPS Equip
- UPS Liebert
- UPS Avocent
- UPS Minute Man
- UPS Minuteman
- UPS Maruson
- UPS V7
- UPS Phoenix Contact
- UPS Puls Dimension
- UPS Vanson
- UPS Salicru
- UPS SurgeX
- UPS Murr Elektronik
- UPS Altronix
- UPS Ditek
- UPS Bxterra
- UPS Middle Atlantic
- UPS FSP
- UPS Atlantis Land
- UPS PowerWalker
- UPS FSP/Fortron
- UPS Online USV
Nieuwste handleidingen voor UPS
18 November 2024
17 November 2024
17 November 2024
17 November 2024
15 November 2024
15 November 2024
14 November 2024
14 November 2024
7 November 2024
7 November 2024