Vulcan 36ESB Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Vulcan 36ESB (21 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 220 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/21
ITW Food Equipment Group, LLC
10405 Westlake Dr.
Charlotte 28273 , NC
RETAIN THIS MANUAL FOR FUTURE USE
FORM F- (06- ) 47201 14
INSTALLATION & OPERATION MANUAL FOR
Salamander Broilers
MODELS
36ESB
www.vulcanhart.com
www.wolfrange.com
36ESB
FORM F-47201 (06- PRINTED IN THE U.S.A. 14)
- - 2
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUAL IFIED TO
INSTALL ELECTICAL EQUIPMENT, WHO SHOULD PERFORM THE INITIAL
FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS
MANUAL.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF
THIS OR ANY OTHER APPLIANCE.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT,
ALTERATION, SERVICE OR MAINTENANCE CAN
CAUSE PROPERTY DAMAGE, INJURY OR DEATH.
READ THE INSTALLATION, OPERATING AND
MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE
INSTALLING OR SERVICING THIS EQUIPMENT.
IN THE EVENT OF A POWER FAILURE, DO NOT
ATTEMPT TO OPERATE THIS DEVICE.
FORM F-47201 (06- PRINTED IN THE U.S.A. 14)
- - 3
INSTALLATION, OPERATION AND CARE OF
ELECTRIC SALAMANANDER BROILERS
GENERAL
Your broiler is produced with quality work manship and materia l. Proper installat ion, usage
and maintenance of your broil er will result in many year s of satisfactory performance.
The manuf acturer suggests that you thoroughly read th is entire manual and carefull y
follo w all of the instructions provided.
INSTALLATION
UNP ACKING
Immediately after unpacking, check for possible shipping damage. If the broiler is found to be
damaged, save the packaging material and contact the carrier within 7 days of delivery.
Before installing, verify that the electrical service agrees with the specications on the rating plate
located under the crumb tray on the right side. If the supply and equipment requirements do not agree,
contact your dealer or Hobart Food Equipment Group Canada immediately.
INSTALLATION CODES AND STANDARDS
Your Vulcan broiler must be installed in accordance with:
1. State and local codes, or in the absence of local codes, with:
2. National Electrical Code ANSI/NFPA-70 (latest edition).
In Canada refer to Canadian Electrical Code C22.1 Part 1 (latest edition).
LO CATION
The equipment area must be kept free and clear of combustible substances.
Minimum Clearance
Combustible Construction
Non-Combustible Construction
Rear
2
0”
Sides
6
0”
Bottom
4” with legs
0”


Product specificaties

Merk: Vulcan
Categorie: Niet gecategoriseerd
Model: 36ESB

Heb je hulp nodig?

Als je hulp nodig hebt met Vulcan 36ESB stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Vulcan

Vulcan

Vulcan VPP40 Handleiding

5 December 2023
Vulcan

Vulcan VG30 Handleiding

18 Augustus 2023
Vulcan

Vulcan VCW46 Handleiding

17 Augustus 2023
Vulcan

Vulcan VHFA18 Handleiding

17 Augustus 2023
Vulcan

Vulcan 36RB Handleiding

17 Augustus 2023
Vulcan

Vulcan VBP15ES Handleiding

17 Augustus 2023
Vulcan

Vulcan VBP13ES Handleiding

17 Augustus 2023
Vulcan

Vulcan VCW26 Handleiding

17 Augustus 2023
Vulcan

Vulcan 36IRB Handleiding

17 Augustus 2023
Vulcan

Vulcan VST3B Handleiding

17 Augustus 2023

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd

Senal

Senal SCS-98 Handleiding

21 November 2024
Senal

Senal ASM-6 Handleiding

21 November 2024
Senal

Senal ASM-MNTKIT Handleiding

21 November 2024
Senal

Senal SMS-45 Handleiding

21 November 2024
Smeg

Smeg KIT6PX Handleiding

21 November 2024
Senal

Senal SCI-3212MP Handleiding

21 November 2024
Senal

Senal OLM-2S-P Handleiding

21 November 2024
Senal

Senal ME-220-CL Handleiding

21 November 2024
Senal

Senal ASM-4 Handleiding

21 November 2024