Soler And Palau Pilot Parc Master Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Soler And Palau Pilot Parc Master (24 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 140 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/24
Technical Manual
PILOT PARC MASTER
Indoor parking unit
2
CONTENTS
1. GENERAL INFORMATION ............................................................................................................................... 3
1.1 Warnings ..................................................................................................................................................... 3
1.2 Reception Storage –.................................................................................................................................... 4
1.3 Warranty ...................................................................................................................................................... 4
2. PRODUCTS PRESENTATION .......................................................................................................................... 5
2.1 Range .......................................................................................................................................................... 5
2.2 Dimensions (in mm) ..................................................................................................................................... 5
2.3 Technical characteristics ............................................................................................................................. 5
3. ELECTRICAL CONNECTION............................................................................................................................ 6
3.1 Power supply ............................................................................................................................................... 6
3.2 Motor(s) power output(s): ............................................................................................................................ 6
3.3 Maximum connection capacity and tightening torque .................................................................................. 7
3.4 Packing box ................................................................................................................................................. 7
3.5 Wiring diagrams : cf. § ANNEXES ............................................................................................................... 7
4. COMMISSIONING ............................................................................................................................................. 8
4.1 Opening remarks ......................................................................................................................................... 8
4.2 Operating logic of the PILOT PARC ............................................................................................................ 8
4.2.1 Operation logic according to the position of front panel switches: ..................................................... 8
4.2.2 Logical processing of PLC inputs signals: ......................................................................................... 9
4.2.3 Assignment of PLC outputs: .............................................................................................................. 9
4.2.4 Other indicators lamps and outputs: ................................................................................................ 10
4.3 Case of a PILOT PARC with « integrated clock » option ........................................................................... 10
4.3.1 Date and Time settings ................................................................................................................... 10
4.3.2 Creating of time slots: ...................................................................................................................... 11
4.3.3 Deletion of time Slots....................................................................................................................... 11
4.3.4 Modication of « the timer about LS before switching in HS» .......................................................... 12
5. MAINTENANCE ............................................................................................................................................... 13
6. WASTE MANAGEMENT ................................................................................................................................. 13
6.1 Treatment of packaging and General industrial waste (GIW) .................................................................... 13
6.2 Treatment of professional WEEE .............................................................................................................. 13
7. ANNEXES ........................................................................................................................................................ 14
7.1 List of external control accessories ............................................................................................................ 14
7.2 Connection for using ESCM 2V ................................................................................................................. 14
7.3 Internal and connection wiring diagrams: .................................................................................................. 15
7.3.1 Version with 1 Dahlander motor ...................................................................................................... 15
7.3.2 Version with 2 Dahlander motors .................................................................................................... 17
7.3.3 Version with 1 motor with independent windings ............................................................................. 19
7.3.4 Version with 2 motors with independent windings ........................................................................... 21
3
1. GENERAL INFORMATION
S&P can not be held liable for any injury or material damage caused by failure to comply with the safety
instructions or due to any modication to product.
The CE markings and declarations of conformity certify conformity with the applicable European standards.
1.1 Warnings
Preliminary remarks
This product has been manufactured in compliance with strict technical safety rules in accordance with EC
standards.
Check that the product in accordance with your order and that the characteristics shown on the name plate is
are compatible with those of the installation.
Before installing and using this product, read these instructions carefully as they contain important information
for your safety and that of users during installation, operation and maintenance.
This manual contains information intended for all personnel exposed to the risks associated with use of the
product in order to prevent any injury to persons and/or material damage consequent upon operation or
maintenance.
The standards and recommendations indicated below reect the applicable standards, especially with regard
to safety. We recommend that all those exposed to risks must comply with the accident prevention standards.
S&P can in no case be held liable for any injury or material damage due to failure to comply with the safety
instructions or due to any modication to product. Regularly check the labels and markings on the product.
These are required to be replaced if they become illegible.
Once installation is complete, ensure this manual is available to the nal user for any later consultation.
Precautions to be taken for the correct operation of the system
The connecting cables must be installed so that unwanted inductive and capacitive do not interfere with the
automation functions (in particular, do not run the control cables along side power cables).
Fluctuations in mains voltage or deviations from its nominal value must not exceed the tolerance limits
indicated in the present instructions as these can cause faulty operation. Ensure that any electrostatic charge
is discharged before touching the controller (PLC).
Note: each time the system is switched on, the controller runs a test program for 5 seconds before entering
RUN mode. The parameters and settings are retained if the supply is interrupted (the clock retention time is
greater than 48h).
Reminder : the installation must comply with the requirements of the EMC and Low Voltage Directives.
The installation of this product and its accessories, their settings and any other work on them must be carried
out by a professional electrician in accordance with best practice, the EMC and Low Voltage Directives,
applicable installation standards and the applicable safety rules.


Product specificaties

Merk: Soler And Palau
Categorie: Niet gecategoriseerd
Model: Pilot Parc Master

Heb je hulp nodig?

Als je hulp nodig hebt met Soler And Palau Pilot Parc Master stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Soler And Palau

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd