Submersible greywater pump ā€¢ Operating/installation manual
DE
Abwasser-Tauchpumpe ā€¢ Bedienungs-/Installationsanleitung
FR
Pompe submersible pour Ć©vacuation des eaux grises
ā€¢
Notice de service/montage
ES
Bomba sumergible para aguas residuales ā€¢ Manual de funcionamento
IT
Pompa sommersa per acque reļ¬‚ue ā€¢ Manuale per lā€™uso e lā€™installazione
NL
Afvalwater-dompelpomp ā€¢ Gebruikers-/installatiehandleiding
PT
Bomba submersĆ­vel para Ć”guas residuais ā€¢
Manual de instalaĆ§Ć£o/utilizaĆ§Ć£o
English 3 ......................................
Deutsch 14 .....................................
FranƧais 26 ....................................
Italiano 38 .....................................
Nederlands 50 ................................
EspaƱol 62 .....................................
PortuguĆŖs 74 .................................
10
- Sound out position of guide pipe frame for coupling pedestal, adjust coupling pedestal on shaft bottom and
mount it with the heavy-duty dowels which are included in the delivery.
- Install pressure pipe and valves in a tension-free manner.
- Slip the guide pipe on the coupling pedestal, shorten it to correct length, slip on pipe clamp and tighten it for good.
- Mount coupling element and lowering chain to the pump, lower pump with the chain (insert guide pipe into
coupling element) and couple it, hang the chain up on the pipe clamp so that it is ready to hand.
- Lay supply cable. Avoid kinks and lay supply cable without tensile loading and without causing chafe marks.
5.3 Level control system
The pumps SANIPUMPĀ® ZPG 71 have to be controlled by means of a level control in such a way, that a
decline of the water level beneath the minimum allowable level (bottom line of motor housing) is avoided at
all costs.
The level control can be effected by means of a ļ¬‚oating switch, electropneumatically (press switch) or by
means of other applicable methods. The switching point of the pump should be set in such a way, that the
pump is entirely submersed under water.
6. COMMISSIONING
Check all connections for correct assembly, set gate valve on passage and check level control system
for proper operation.
During the initial test run, check pipes for tightness and reseal them, if necessary.
7. MAINTENANCE AND REPAIR
Disconnect the power supply before carrying out any kind of
work on the plant!
After an operation time of six to twelve months, the oil storage inside the seal carrier always has to be
controlled as follows:
- put the pump on its side on a clean surface and position it in such a way that the oil ļ¬lling screw faces upwards,
- take out the screw and check the oil level.
If only a small quantity of oil is lacking, the oil storage can be ļ¬lled up without any problems. If a
considerable quantity of oil is lacking, or if the oil is mingled with water, the customer department has
to be informed.
All other maintenance works on the pump and on the electrical equipment should be carried out by the
manufacturer or an authorised qualiļ¬ed company in intervals of six to twelve months (or also in shorter
intervals, according to case of operation). Please immediately inform the customer department in case
of damage to the pump and/or the electrical equipment.
8. MALFUNCTIONS, CAUSES AND TROUBLESHOOTING
Disconnect the power supply before carrying out any kind of work
on the plant!


Product specificaties

Merk: Sanibroyeur
Categorie: Pomp
Model: Sanipump ZPG 71