Kyoritsu KEW 6010B Handleiding
Kyoritsu
Multimeter
KEW 6010B
Lees hieronder de π handleiding in het Nederlandse voor Kyoritsu KEW 6010B (36 pagina's) in de categorie Multimeter. Deze handleiding was nuttig voor 17 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld
Pagina 1/36
KEW 6010B
MULTI-FUNCTION TESTER
INSTRUCTION MANUAL
KYORITSU ELECTRICAL INSTRUMENTS
WORKSοΌLTD.
β
1 Safety Warning ................................................................................. 1οΌ
β
2 Instrument Layout ........................................................................... 4οΌ
β
3 Features ......................................................................................... 5οΌ
β
4 Specification ................................................................................... 7οΌ
β
5 Continuity (resistance) tests ........................................................... 10 οΌ
β
β οΌ5 1β
β
Test procedure ..................................................................... 10
β
6οΌInsulation Tests ............................................................................. 12
β
β οΌ6 1
βββ
The nature of insulation resistance ....................................... 12
β
β οΌ6 1οΌ2
β
Capacitive current ............................................................... 12
β
β οΌ6 1οΌ3
β
Conduction current .............................................................. 13
β
β οΌ6 1οΌ4
β
Surface leakage current ....................................................... 13
β
β οΌ6 1οΌ5
β
Total leakage current ............................................................ 13
β
β οΌ6 2β
β
Damage to voltage sensitive equipment ............................... 14
β
β οΌ6 3β
β
Preparation for measurement ............................................... 15
β
β οΌ6 4β
β
Insulation resistance measurement ...................................... 15
β
7 Loop Impedance Tests .................................................................. 17οΌ
β
β οΌ7 1β
β
Voltage measurement ........................................................... 17
β
β οΌ7 2β
β
What is earth fault loop impedance? ..................................... 17
β
β οΌ7 3β
β
Automatic over-temperature cut-out ..................................... 18
β
β οΌ7 4β
β
The loop impedance test ...................................................... 19
β
β οΌ7 5β
β
Loop impedance at 3 phase equipment ................................ 20
β
8οΌRCD/Uc Tests ............................................................................... 21
β
β οΌ8 1β
β
Purpose of RCD Test ............................................................ 21
β
β οΌ8 2β
β
What does the RCD test really do? ....................................... 21
β
β οΌ8 3β
β
What is Uc? .......................................................................... 22
β
β οΌ8 4β
β
Uc Testing ........................................................................... 23
β
β οΌ8 5β
β
Operation of KEW 6010B RCD testing ................................. 23
β
β οΌ8 6β
β
RCD testing ......................................................................... 23
β
β οΌ8 6οΌ1
β
"NO TRIP" and "TRIP" test ................................................... 23
β
β οΌ8 6οΌ2
β
"FAST TRIP" test .................................................................. 25
β
β οΌ8 6οΌ3
β
Testing DC sensitive RCDs ................................................... 25
β
β οΌ8 6οΌ4
β
Testing Auto Ramp ............................................................... 25
β
β οΌ8 7β
β
Testing time delayed RCD's .................................................. 26
β
9 Store / Recall a measured result .................................................... 27οΌ
β
β οΌ9 1β
β
How to store the data ........................................................... 27
β
β οΌ9 2β
β
Recall the stored data .......................................................... 28
β
β οΌ9 3β
β
Delete the stored data .......................................................... 29
β
β οΌ9 4β
β
Transfer the stored data to PC .............................................. 30
10 Battery / Fuse replacement ........................................................... 31οΌ
11οΌGeneral ........................................................................................ 32
12 Servicing ...................................................................................... 32οΌ
13 Case, Strap and Shoulder-pad assembly ...................................... 33οΌ
CONTENTS
β
1
β
1.
SAFETY WARNING
Electricity is dangerous and can cause injury and death. To avoid possible
electric shock, personal injury or damage of instrument, always treat it with
the greatest of respect and care. If you are not quite sure how to proceed,
stop and take advice from a qualified person.
1. This instrument must only be used by a competent and trained person and
operated in strict accordance with the instructions. KYORITSU will not
accept liability for any damage or injury caused by misuse or non-
compliance with the instructions or with the safety procedures.
2. It is essential to read and to understand the safety rules contained in the
instructions. They must always be observed when using the instrument.
3. This instrument is only intended for single phase operation at 230V AC
+10%, -15% phase to earth or phase to neutral operation, and then only for
Loop, RCD and Uc testing. For use in the continuity testing and insulation
testing modes this instrument must be used ONLY on circuits
which are de-energized.
4. Verify the tester's operation by measuring a known voltage before and
after using it.
5. When conducting tests do not touch any exposed metalwork associated
with the installation. Such metalwork may become live for the duration of
the test.
6. Never open the instrument case (except for fuse and battery
replacement and in this case disconnect all leads first) because dangerous
voltages are present. Only fully trained and competent electrical engineers
should open the case. If a fault develops, return the instrument to your
distributor for inspection and repair.
7. If the overheat symbol appears in the display " " disconnect the
instrument from the mains supply and allow to cool down.
8. For loop impedance tests to prevent unwanted tripping during loop testing
all residual current devices(RCDs) must be taken out of the circuit and
temporarily replaced with a suitably rated MCB unit. The RCD must be
replaced after the loop test is completed.
9. If abnormal conditions of any sort are noted (such as a faulty display,
unexpected readings, broken case, cracked test leads, etc) do not use the
tester and return it to your distributor for repair.
10. For safety reasons only use accessories (test leads, probes, fuses, cases,
etc) designed to be used with this instrument and recommended by
KYORITSU. The use of other accessories is prohibited as they are unlikely to
have the correct safety features.
11.
When testing, always be sure to keep your fingers behind the protective
fingerguard on the test leads.
12.
During testing it is possible that there may be a momentary degradation of
the reading due to the presence of excessive transients or discharges on
the electrical system under test. Should this be observed, the test must be
repeated to obtain a correct reading. If in doubt, contact your distributor.
13.
The sliding shutter on the back of the instrument is a safety device. The
instrument should not be used if it is damaged or impaired in any way, but
Product specificaties
Merk: | Kyoritsu |
Categorie: | Multimeter |
Model: | KEW 6010B |
Heb je hulp nodig?
Als je hulp nodig hebt met Kyoritsu KEW 6010B stel dan hieronder een vraag en andere gebruikers zullen je antwoorden
Handleiding Multimeter Kyoritsu
1 December 2024
1 December 2024
1 December 2024
5 Januari 2024
5 Januari 2024
5 Januari 2024
5 Januari 2024
5 Januari 2024
4 Januari 2024
4 Januari 2024
Handleiding Multimeter
- Multimeter Abus
- Multimeter Aldi
- Multimeter Alecto
- Multimeter Altai
- Multimeter Amiko
- Multimeter Amprobe
- Multimeter Appa
- Multimeter Basetech
- Multimeter Beha-Amprobe
- Multimeter Benning
- Multimeter Brandson
- Multimeter Brennenstuhl
- Multimeter Bruder Mannesmann
- Multimeter Digitus
- Multimeter Elma
- Multimeter Elro
- Multimeter Extech
- Multimeter Ferm
- Multimeter Flir
- Multimeter Fluke
- Multimeter Gembird
- Multimeter Gossen Metrawatt
- Multimeter Greenlee
- Multimeter Hager
- Multimeter Hubinont
- Multimeter Ideal
- Multimeter Keithley
- Multimeter Kingcraft
- Multimeter Laserliner
- Multimeter Mastech
- Multimeter Maxwell
- Multimeter Megger
- Multimeter Metrel
- Multimeter Metrix
- Multimeter Micronta
- Multimeter Milwaukee
- Multimeter Monacor
- Multimeter Parkside
- Multimeter PCE Instruments
- Multimeter Perel
- Multimeter Plieger
- Multimeter Powerfix
- Multimeter Profile
- Multimeter Sanwa
- Multimeter Schneider
- Multimeter Silverline
- Multimeter Skandia
- Multimeter Stanley
- Multimeter TFA
- Multimeter Topcraft
- Multimeter Uni-T
- Multimeter Velleman
- Multimeter Voltcraft
- Multimeter Wiha
- Multimeter Workzone
- Multimeter Joy-it
- Multimeter Jung
- Multimeter Clas Ohlson
- Multimeter Steren
- Multimeter Klein Tools
- Multimeter EMOS
- Multimeter Tacklife
- Multimeter Biltema
- Multimeter REV
- Multimeter Etekcity
- Multimeter Testo
- Multimeter Somogyi
- Multimeter Testboy
- Multimeter Yato
- Multimeter Wago
- Multimeter GW Instek
- Multimeter Owon
- Multimeter Projecta
- Multimeter Cablexpert
- Multimeter HΓΆgert
- Multimeter Multimetrix
- Multimeter Digi-tool
- Multimeter Kewtech
- Multimeter Sonel
- Multimeter Testec
- Multimeter Vimar
- Multimeter Strex
- Multimeter PeakTech
- Multimeter MBS
- Multimeter MGL Avionics
- Multimeter Rigol
- Multimeter Chauvin Arnoux
- Multimeter Aim TTi
- Multimeter CEM
- Multimeter Horex
- Multimeter Cosinus
- Multimeter Kurth Electronic
- Multimeter IWH
- Multimeter Weltron
- Multimeter Rohde & Schwarz
- Multimeter EEVBlog
- Multimeter WeidmΓΌller
- Multimeter HT Instruments
- Multimeter Caltek
- Multimeter Elworks
- Multimeter Qian
- Multimeter Bearware
- Multimeter Noyafa
Nieuwste handleidingen voor Multimeter
21 December 2024
16 December 2024
7 December 2024
7 December 2024
5 December 2024
5 December 2024
3 December 2024
2 December 2024
1 December 2024
1 December 2024