Hestan Aspire 20 Handleiding


Lees hieronder de 📖 handleiding in het Nederlandse voor Hestan Aspire 20 (8 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 30 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/8
©2017 Hestan Commercial Corporation
1
OUTDOOR CABINETS
Installation Instructions
AETRC / AETC
CABINET INSTALLATION (AETRC)
IMPORTANT - READ ALL INSTRUCTIONS BEFORE YOU BEGIN
INSTALLER SHOULD LEAVE THESE INSTRUCTIONS WITH THE HOMEOWNER
1. Your new Aspire cabinets come with doors and drawers pre-installed in their frames. It will be necessary
to detach them before installing the frame in your island structure. To remove the drawer(s) from the
frame, press the release lever (see below) on each side of the drawer to disengage the slide (up on the left,
down on the right), then pull the drawer all the way out.
Some parts have sharp edges. Care must be taken when handling the various components to avoid personal
injury. Wear gloves when handling.
TOOLS REQUIRED:
Work gloves
Safety glasses
Electric drill with assorted bits for mounting hardware, masonry anchors, etc. where needed
Phillips screwdriver
Flat-blade screwdriver
Level
Tape measure
Inspect the product to verify that there is no shipping damage. If any damage is detected, call the shipper and
initiate a damage claim. Hestan Commercial Corp. is not responsible for shipping damage. DO NOT discard
any packing material (box, pallet, straps) until the unit has been inspected.
Remove all exterior packaging materials, banding, tape, etc. Remove all protective film from the inside of your
cabinets. You may leave any exterior protective film on until after installation is complete.
RELEASE
LEVER
FRAME
©2017 Hestan Commercial Corporation
2
CABINET INSTALLATION
(continued)
2. Consult the table at the end of this instruction manual to determine the appropriate cutout dimensions
for the Aspire Outdoor cabinet product you are installing. The cutouts should be square at all corners
for proper fitment of the cabinet. The installer will have to build up any internal structural elements or
supports in the island in order to secure the cabinet in place. Stainless steel hardware (not included) is
highly recommended.
3. Slide the frame into the opening and check for proper alignment. Secure the frame to the structural
members of your island using the various available mounting holes in the frame, and inside the cabinet
itself. Use at least 2 screws per side.
4. Reinstall the drawer(s) by aligning the slides on either side and pushing the drawer back into the opening.
You will hear the release levers click. Open and close the drawer a few times to check for proper function
and alignment. There are adjustment screws on either side of the drawer should vertical adjustment be
needed.
©2017 Hestan Commercial Corporation
3
CABINET INSTALLATION
(AETC)
1. Consult the table at the end of this instruction manual for proper location and cutout dimensions
for the trash chute (AETC), when used in conjunction with the Aspire Trash & Recycling Center
(AETRC20).


Product specificaties

Merk: Hestan
Categorie: Niet gecategoriseerd
Model: Aspire 20

Heb je hulp nodig?

Als je hulp nodig hebt met Hestan Aspire 20 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Hestan

Hestan

Hestan GFDSL241 Handleiding

27 Februari 2024
Hestan

Hestan GRWSR24 Handleiding

27 Februari 2024
Hestan

Hestan GFDSL242 Handleiding

27 Februari 2024
Hestan

Hestan AGIJ36 Handleiding

27 Februari 2024
Hestan

Hestan GRC30 Handleiding

27 Februari 2024
Hestan

Hestan AGIJ30 Handleiding

27 Februari 2024
Hestan

Hestan AGIJ42 Handleiding

27 Februari 2024
Hestan

Hestan GRWGL24 Handleiding

27 Februari 2024
Hestan

Hestan Aspire 20 Handleiding

23 Augustus 2023

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd