Fujitsu AOYG45KRTA Handleiding

Fujitsu Airco AOYG45KRTA

Lees hieronder de 📖 handleiding in het Nederlandse voor Fujitsu AOYG45KRTA (21 pagina's) in de categorie Airco. Deze handleiding was nuttig voor 21 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/21
En-1
WARNING
• Installationofthisproductmustbedonebyexperiencedservicetechniciansor
professionalinstallersonlyinaccordancewiththismanual.Installationbynonprofes-
sionalorimproperinstallationoftheproductmaycauseseriousaccidentssuchas
injury,waterleakage,electricshock,orre.Iftheproductisinstalledindisregardof
theinstructionsinthismanual,itwillvoidthemanufacturer’swarranty.
• Toavoidgettinganelectricshock,nevertouchtheelectricalcomponentssoon
afterthepowersupplyhasbeenturnedo󰀨.Afterturningo󰀨thepower,alwayswait
10minutesormorebeforeyoutouchtheelectricalcomponents.
• Donotturnonthepoweruntilallworkhasbeencompleted.Turningonthepowerbe-
foretheworkiscompletedcancauseseriousaccidentssuchaselectricshockorre.
• Ifrefrigerantleakswhileworkisbeingcarriedout,ventilatethearea.Iftherefrigerant
comesincontactwithaame,itproducesatoxicgas.
• Installationmustbeperformedinaccordancewithregulations,codes,orstandards
forelectricalwiringandequipmentineachcountry,region,ortheinstallationplace.
• Donotusethisequipmentwithairoranyotherunspeciedrefrigerantintherefriger-
antlines.Excesspressurecancausearupture.
• Duringinstallation,makesurethattherefrigerantpipeisattachedrmlybeforeyou
runthecompressor.
Donotoperatethecompressorundertheconditionofrefrigerantpipingnotattached
properlywith3-wayvalveopen.Thismaycauseabnormalpressureintherefrigera-
tioncyclethatleadstoruptureandeveninjury.
• Wheninstallingorrelocatingtheairconditioner,donotmixgasesotherthanthe
speciedrefrigerant(R32)toentertherefrigerantcycle.
Ifairorothergasenterstherefrigerantcycle,thepressureinsidethecyclewillriseto
anabnormallyhighvalueandcauserupture,injury,etc.
• Toconnecttheindoorunitandoutdoorunit,useairconditionerpipingandcables
availablelocallyasstandardparts.Thismanualdescribesproperconnectionsusing
suchinstallationset.
• Donotmodifypowercable,useextensioncableorbranchwiring.Improperusemay
causeelectricshockorrebypoorconnection,insu󰀩cientinsulationorovercurrent.
• Donotpurgetheairwithrefrigerantsbutuseavacuumpumptovacuumtheinstallation.
• Thereisnotextrarefrigerantintheoutdoorunitforairpurging.
• UseavacuumpumpforR32orR410Aexclusively.
• Usingthesamevacuumpumpfordi󰀨erentrefrigerantsmaydamagethevacuum
pumportheunit.
• UseacleangaugemanifoldandcharginghoseforR32orR410Aexclusively.
• Donotusemeanstoacceleratethedefrostingprocessortoclean,otherthanthose
recommendedbythemanufacturer.
• Theapplianceshallbestoredinaroomwithoutcontinuouslyoperatingignitionsources
(forexample:openames,anoperatinggasapplianceoranoperatingelectricheater).
• Donotpierceorburn.
• Beawarethatrefrigerantsmaynotcontainanodour.
• Duringthepump-downoperation,makesurethatthecompressoristurnedo󰀨before
youremovetherefrigerantpiping.
Donotremovetheconnectionpipewhilethecompressorisinoperationwith3-way
valveopen.
Thismaycauseabnormalpressureintherefrigerationcyclethatleadstoruptureand
eveninjury.
• Thisapplianceisnotintendedforusebypersons(includingchildren)withreduced
physical,sensoryormentalcapabilities,orlackofexperienceandknowledge,unless
theyhavebeengivensupervisionorinstructionconcerninguseoftheappliancebya
personresponsiblefortheirsafety.Childrenshouldbesupervisedtoensurethatthey
donotplaywiththeappliance.
• Ifthepowercableortheconnectioncableisdamaged,itmustbereplacedbythe
manufacturer,itsserviceagentorsimilarqualiedpersonsinordertoavoidasafety
hazard.
• Keepanyrequiredventilationopeningsclearofobstruction.
CAUTION
• Fortheairconditionertoworkappropriately,installitaswritteninthismanual.
• Thisproductmustbeinstalledbyqualiedpersonnelwithacapacitycerticationof
handlingrefrigerantuids.Refertoregulationandlawsinuseoninstallationplace.
• Installtheproductbyfollowinglocalcodesandregulationsinforceattheplaceof
installation,andtheinstructionsprovidedbythemanufacturer.
• Thisproductispartofasetconstitutinganairconditioner.Theproductmustnotbe
installedaloneorbeinstalledwithnon-authorizeddevicebythemanufacturer.
• Alwaysuseaseparatepowersupplylineprotectedbyacircuitbreakeroperatingon
allwireswithadistancebetweencontactof3mmforthisproduct.
• Toprotectthepersons,ground(earth)theproductcorrectly,andusethepowercable
combinedwithanEarthLeakageCircuitBreaker(ELCB).
• Thisproductisnotexplosionproof,andthereforeshouldnotbeinstalledinexplosive
atmosphere.
• Thisproductcontainsnouser-serviceableparts.Alwaysconsultexperiencedservice
techniciansforrepairing.
• Wheninstallingpipesshorterthan3m,soundoftheoutdoorunitwillbetransferred
totheindoorunit,whichwillcauselargeoperatingsoundorsomeabnormalsound.
• Whenmovingorrelocatingtheairconditioner,consultexperiencedservicetechni-
ciansfordisconnectionandreinstallationoftheproduct.
• Donottouchthensoftheheatexchanger.Touchingtheheatexchangernscould
resultindamagetothensorpersonalinjurysuchasskinrupture.
• Anindooruniterror(errorcode:2-3)occursifanindoorunitforR410Aisconnectedto
therefrigerantsysteminaconcurrentmultipleconnectionenvironment.Inthatcase,
notetheindoormodelnamethatexperiencestheerror,andcontactourservicecentre.
AIRCONDITIONER
OUTDOORUNIT
INSTALLATION MANUAL
PARTNo.9379069960-02
1. SAFETY PRECAUTIONS
• Besuretoreadthismanualthoroughlybeforeinstallation.
• Thewarningsandprecautionsindicatedinthismanualcontainimportantinformation
pertainingtoyoursafety.Besuretoobservethem.
• Handthismanual,togetherwiththeoperationmanual,tothecustomer.Requestthe
customertokeepthemonhandforfutureuse,suchasforrelocatingorrepairingthe
unit.
WARNING
Indicatesapotentiallyorimminentlyhazardoussituation
which,ifnotavoided,couldresultindeathorseriousinjury.
CAUTION
Indicatesapotentiallyhazardoussituationthatmayresultin
minorormoderateinjuryordamagetoproperty.
[Originalinstructions] Forauthorizedservicepersonnelonly.
Contents
1. SAFETYPRECAUTIONS............................................................................1
2. PRODUCTSPECIFICATION.......................................................................3
2.1.Installationtools....................................................................................3
2.2.Accessories..........................................................................................4
2.3.Piperequirements................................................................................4
2.4.Electricalrequirements.........................................................................5
2.5.Additionalchargeamount.....................................................................5
2.6.Generalinformation..............................................................................6
3. INSTALLATIONWORK...............................................................................6
3.1.Installationdimensions.........................................................................7
3.2.Transportingtheunit.............................................................................7
3.3.Mountingtheunit..................................................................................8
3.4.Draininstallation...................................................................................8
3.5.Pipeinstallation....................................................................................8
3.6.Sealingtest.........................................................................................10
3.7.Vacuumprocess.................................................................................10
3.8.Additionalcharging............................................................................. 11
3.9.Electricalwiring................................................................................... 11
4. TESTRUN.................................................................................................14
4.1.Pre-testruncheckitems.....................................................................14
4.2.Testoperationmethod........................................................................14
4.3.Checklist.............................................................................................14
5. FINISHING.................................................................................................15
5.1.Installinginsulation.............................................................................15
5.2.Fillingwithputty..................................................................................15
6. HOWTOOPERATEDISPLAYUNIT.........................................................15
6.1.Displayunitposition............................................................................15
6.2.Descriptionofdisplayandbuttons......................................................15
7. FIELDSETTING........................................................................................16
7.1.Fieldsettingbuttons...........................................................................16
7.2.Functionsettings................................................................................16
8. EXTERNALINPUTANDOUTPUT............................................................ 17
8.1.Externalinput......................................................................................17
8.2.Externaloutput...................................................................................18
9. PUMPDOWN............................................................................................18
9.1.Preparationforpumpdown................................................................ 19
9.2.Pumpdownprocedure.......................................................................19
10. ERRORCODES........................................................................................19
10.1.Errordisplaymode...........................................................................19
10.2.Errorcodechecktable......................................................................20
EnglishDeutschFrançaisEspañolItalianoEλληvIkάPortuguêsРусский
Türkçe
Türkçe
En-2
2-7.Checkstotherefrigerationequipment
• Whereelectricalcomponentsarebeingchanged,theyshallbetforthepurpose
andtothecorrectspecication.
• Atalltimesthemanufacturer’smaintenanceandserviceguidelinesshallbefollowed.
• Ifindoubtconsultthemanufacturer’stechnicaldepartmentforassistance.
• Thefollowingchecksshallbeappliedtoinstallationsusingammablerefrigerants.
-Thechargesizeisinaccordancewiththeroomsizewithinwhichtherefrigerant
containingpartsareinstalled.
-Theventilationmachineryandoutletsareoperatingadequatelyandarenot
obstructed.
-Ifanindirectrefrigeratingcircuitisbeingused,thesecondarycircuitshallbe
checkedforthepresenceofrefrigerant.
-Markingtotheequipmentcontinuestobevisibleandlegible.Markingsandsigns
thatareillegibleshallbecorrected.
-Refrigerationpipeorcomponentsareinstalledinapositionwheretheyareunlikely
tobeexposedtoanysubstancewhichmaycorroderefrigerantcontainingcompo-
nents,unlessthecomponentsareconstructedofmaterialswhichareinherently
resistanttobeingcorrodedoraresuitablyprotectedagainstbeingsocorroded.
2-8.Checkstoelectricaldevices
• Repairandmaintenancetoelectricalcomponentsshallincludeinitialsafetychecks
andcomponentinspectionprocedures.
• Ifafaultexiststhatcouldcompromisesafety,thennoelectricalsupplyshallbe
connectedtothecircuituntilitissatisfactorilydealtwith.
• Ifthefaultcannotbecorrectedimmediatelybutitisnecessarytocontinueopera-
tion,anadequatetemporarysolutionshallbeused.
• Thisshallbereportedtotheowneroftheequipmentsoallpartiesareadvised.
• Initialsafetychecksshallinclude.
-Thatcapacitorsaredischarged:thisshallbedoneinasafemannertoavoid
possibilityofsparking.
-Thattherenoliveelectricalcomponentsandwiringareexposedwhilecharging,
recoveringorpurgingthesystem.
-Thatthereiscontinuityofearthbonding.
3.Repairstosealedcomponents
• Duringrepairstosealedcomponents,allelectricalsuppliesshallbedisconnected
fromtheequipmentbeingworkeduponpriortoanyremovalofsealedcovers,etc.
• Ifitisabsolutelynecessarytohaveanelectricalsupplytoequipmentduringservic-
ing,thenapermanentlyoperatingformofleakdetectionshallbelocatedatthe
mostcriticalpointtowarnofapotentiallyhazardoussituation.
• Particularattentionshallbepaidtothefollowingtoensurethatbyworkingon
electricalcomponents,thecasingisnotalteredinsuchawaythatthelevelof
protectionisa󰀨ected.
• Thisshallincludedamagetocables,excessivenumberofconnections,terminals
notmadetooriginalspecication,damagetoseals,incorrectttingofglands,etc.
• Ensurethatapparatusismountedsecurely.
• Ensurethatsealsorsealingmaterialshavenotdegradedsuchthattheynolonger
servethepurposeofpreventingtheingressofammableatmospheres.
• Replacementpartsshallbeinaccordancewiththemanufacturer’sspecications.
NOTES:Theuseofsiliconsealantmayinhibitthee󰀨ectivenessofsometypesof
leakdetectionequipment.
Intrinsicallysafecomponentsdonothavetobeisolatedpriortoworking
onthem.
4.Repairtointrinsicallysafecomponents
• Donotapplyanypermanentinductiveorcapacitanceloadstothecircuitwithout
ensuringthatthiswillnotexceedthepermissiblevoltageandcurrentpermittedfor
theequipmentinuse.
• Intrinsicallysafecomponentsaretheonlytypesthatcanbeworkedonwhilelivein
thepresenceofaammableatmosphere.
• Thetestapparatusshallbeatthecorrectrating.
• Replacecomponentsonlywithpartsspeciedbythemanufacturer.
• Otherpartsmayresultintheignitionofrefrigerantintheatmospherefromaleak.
5.Cabling
• Checkthatcablingwillnotbesubjecttowear,corrosion,excessivepressure,vibra-
tion,sharpedgesoranyotheradverseenvironmentale󰀨ects.
• Thecheckshallalsotakeintoaccountthee󰀨ectsofagingorcontinualvibration
fromsourcessuchascompressorsorfans.
6.Detectionofammablerefrigerants
• Undernocircumstancesshallpotentialsourcesofignitionbeusedinthesearching
forordetectionofrefrigerantleaks.
• Ahalidetorch(oranyotherdetectorusinganakedame)shallnotbeused.
7.Leakdetectionmethods
• Electronicleakdetectorsshallbeusedtodetectammablerefrigerants,butthe
sensitivitymaynotbeadequate,ormayneedre-calibration.(Detectionequipment
shallbecalibratedinarefrigerant-freearea.)
• Ensurethatthedetectorisnotapotentialsourceofignitionandissuitableforthe
refrigerantused.
• LeakdetectionequipmentshallbesetatapercentageoftheLFLoftherefrigerant
andshallbecalibratedtotherefrigerantemployedandtheappropriatepercentage
ofgas(25%maximum)isconrmed.
• Leakdetectionuidsaresuitableforusewithmostrefrigerantsbuttheuseof
detergentscontainingchlorineshallbeavoidedasthechlorinemayreactwiththe
refrigerantandcorrodethecopperpipe-work.
• Ifaleakissuspected,allnakedamesshallberemoved/extinguished.
• Ifaleakageofrefrigerantisfoundwhichrequiresbrazing,alloftherefrigerantshall
berecoveredfromthesystem,orisolated(bymeansofshuto󰀨valves)inapartof
thesystemremotefromtheleak.
Oxygenfreenitrogen(OFN)shallthenbepurgedthroughthesystembothbefore
andduringthebrazingprocess.
Precautions for using R32 refrigerant
Thebasicinstallationworkproceduresarethesameasconventionalrefrigerant(R410A,
R22)models.
However,paycarefulattentiontothefollowingpoints:
WARNING
• Sincetheworkingpressureis1.6timeshigherthanthatofrefrigerantR22models,
someofthepipingandinstallationandservicetoolsarespecial.(Referto
“2.1.Instal-
lationtools”.)
Especially,whenreplacingarefrigerantR22modelwithanewrefrigerantR32model,
alwaysreplacetheconventionalpipingandarenutswiththeR32andR410Apiping
andarenutsontheoutdoorunitside.
ForR32andR410A,thesamearenutontheoutdoorunitsideandpipecanbe
used.
• ModelsthatuserefrigerantR32andR410Ahaveadi󰀨erentchargingportthread
diametertopreventerroneouschargingwithrefrigerantR22andforsafety.There-
fore,checkbeforehand.[ThechargingportthreaddiameterforR32andR410Ais1/2
inch.]
• BemorecarefulthanR22sothatforeignmatter(oil,water,etc.)doesnotenterthe
piping.
Also,whenstoringthepiping,securelysealtheopeningbypinching,taping,etc.
(HandlingofR32issimilartoR410A.)
CAUTION
1.Installation(Space)
• Thattheinstallationofpipe-workshallbekepttoaminimum.
• Thatpipe-workshallbeprotectedfromphysicaldamage.
• Thatcompliancewithnationalgasregulationsshallbeobserved.
• Thatmechanicalconnectionsshallbeaccessibleformaintenancepurposes.
• Incasesthatrequiremechanicalventilation,ventilationopeningsshallbekept
clearofobstruction.
• Whendisposingoftheproductisused,bebasedonnationalregulations,properly
processed.
2.Servicing
2-1.Servicepersonnel
• Anypersonwhoisinvolvedwithworkingonorbreakingintoarefrigerantcircuit
shouldholdacurrentvalidcerticatefromanindustry-accreditedassessment
authority,whichauthorizestheircompetencetohandlerefrigerantssafelyinac-
cordancewithanindustryrecognisedassessmentspecication.
• Servicingshallonlybeperformedasrecommendedbytheequipmentmanufac-
turer.Maintenanceandrepairrequiringtheassistanceofotherskilledpersonnel
shallbecarriedoutunderthesupervisionofthepersoncompetentintheuseof
ammablerefrigerants.
• Servicingshallbeperformedonlyasrecommendedbythemanufacturer.
2-2.Work
• Priortobeginningworkonsystemscontainingammablerefrigerants,safety
checksarenecessarytoensurethattheriskofignitionisminimised.Forrepairto
therefrigeratingsystem,theprecautionsin2-2to2-8shallbecompliedwithprior
toconductingworkonthesystem.
• Workshallbeundertakenunderacontrolledproceduresoastominimizetherisk
ofaammablegasorvapourbeingpresentwhiletheworkisbeingperformed.
• Allmaintenancesta󰀨andothersworkinginthelocalareashallbeinstructedonthe
natureofworkbeingcarriedout.
• Workinconnedspacesshallbeavoided.
• Theareaaroundtheworkspaceshallbesectionedo󰀨.
• Ensurethattheconditionswithintheareahavebeenmadesafebycontrolofam-
mablematerial.
2-3.Checkingforpresenceofrefrigerant
• Theareashallbecheckedwithanappropriaterefrigerantdetectorpriortoanddur-
ingwork,toensurethetechnicianisawareofpotentiallyammableatmospheres.
• Ensurethattheleakdetectionequipmentbeingusedissuitableforusewitham-
mablerefrigerants,i.e.nonsparking,adequatelysealedorintrinsicallysafe.
2-4.Presenceofreextinguisher
• Ifanyhotworkistobeconductedontherefrigerationequipmentoranyassociated
parts,appropriatereextinguishingequipmentshallbeavailableathand.
• HaveadrypowderorCO2reextinguisheradjacenttothechargingarea.
2-5.Noignitionsources
• Nopersoncarryingoutworkinrelationtoarefrigerationsystemwhichinvolves
exposinganypipeworkthatcontainsorhascontainedammablerefrigerantshall
useanysourcesofignitioninsuchamannerthatitmayleadtotheriskofreor
explosion.
• Allpossibleignitionsources,includingcigarettesmoking,shouldbekeptsu󰀩cient-
lyfarawayfromthesiteofinstallation,repairing,removinganddisposal,during
whichammablerefrigerantcanpossiblybereleasedtothesurroundingspace.
• Priortoworktakingplace,theareaaroundtheequipmentistobesurveyedto
makesurethattherearenoammablehazardsorignitionrisks.“NoSmoking”
signsshallbedisplayed.
2-6.Ventilatedarea
• Ensurethattheareaisintheopenorthatitisadequatelyventilatedbeforebreak-
ingintothesystemorconductinganyhotwork.
• Adegreeofventilationshallcontinueduringtheperiodthattheworkiscarriedout.
• Theventilationshouldsafelydisperseanyreleasedrefrigerantandpreferably
expelitexternallyintotheatmosphere.
En-3
CAUTION
8.Removalandevacuation
• Whenbreakingintotherefrigerantcircuittomakerepairs–orforanyother
purpose–conventionalproceduresshallbeused.
However,itisimportantthatbestpracticeisfollowedsinceammabilityisa
consideration.
Thefollowingprocedureshallbeadheredto:
• removerefrigerant
• purgethecircuitwithinertgas
• evacuate
• purgeagainwithinertgas
• openthecircuitbycuttingorbrazing
• Therefrigerantchargeshallberecoveredintothecorrectrecoverycylinders.
• Thesystemshallbe“ushed”withOFNtorendertheunitsafe.
• Thisprocessmayneedtoberepeatedseveraltimes.
• Compressedairoroxygenshallnotbeusedforthistask.
• FlushingshallbeachievedbybreakingthevacuuminthesystemwithOFNand
continuingtolluntiltheworkingpressureisachieved,thenventingtoatmosphere,
andnallypullingdowntoavacuum.
• Thisprocessshallberepeateduntilnorefrigerantiswithinthesystem.
• WhenthenalOFNchargeisused,thesystemshallbeventeddowntoatmo-
sphericpressuretoenableworktotakeplace.
• Thisoperationisabsolutelyvitalifbrazingoperationsonthepipeworkaretotake
place.
• Ensurethattheoutletforthevacuumpumpisnotclosetoanyignitionsourcesand
thereisventilationavailable.
9.Chargingprocedures
• Inadditiontoconventionalchargingprocedures,thefollowingrequirementsshall
befollowed.
-Ensurethatcontaminationofdi󰀨erentrefrigerantsdoesnotoccurwhenusing
chargingequipment.
-Hosesorlinesshallbeasshortaspossibletominimizetheamountofrefriger-
antcontainedinthem.
-Cylindersshallbekeptupright.
-Ensurethattherefrigerationsystemisearthedpriortochargingthesystemwith
refrigerant.
-Labelthesystemwhenchargingiscomplete(ifnotalready).
-Extremecareshallbetakennottooverlltherefrigerationsystem.
• PriortorechargingthesystemitshallbepressuretestedwithOFN.
• Thesystemshallbeleaktestedoncompletionofchargingbutpriortocommis-
sioning.
• Afollowupleaktestshallbecarriedoutpriortoleavingthesite.
10.Decommissioning
• Beforecarryingoutthisprocedure,itisessentialthatthetechnicianiscompletely
familiarwiththeequipmentandallitsdetails.
• Itisrecommendedgoodpracticethatallrefrigerantsarerecoveredsafely.
• Priortothetaskbeingcarriedout,anoilandrefrigerantsampleshallbetakenin
caseanalysisisrequiredpriortore-useofreclaimedrefrigerant.
• Itisessentialthatelectricalpowerisavailablebeforethetaskiscommenced.
a)Becomefamiliarwiththeequipmentanditsoperation.
b)Isolatesystemelectrically.
c)Beforeattemptingtheprocedureensurethat:
• mechanicalhandlingequipmentisavailable,ifrequired,forhandlingrefrig-
erantcylinders;
• allpersonalprotectiveequipmentisavailableandbeingusedcorrectly;
• therecoveryprocessissupervisedatalltimesbyacompetentperson;
• recoveryequipmentandcylindersconformtotheappropriatestandards.
d)Pumpdownrefrigerantsystem,ifpossible.
e)Ifavacuumisnotpossible,makeamanifoldsothatrefrigerantcanbere-
movedfromvariouspartsofthesystem.
f)Makesurethatcylinderissituatedonthescalesbeforerecoverytakesplace.
g)Starttherecoverymachineandoperateinaccordancewithmanufacturer’s
instructions.
h)Donotoverllcylinders.(Nomorethan80%volumeliquidcharge).
i)Donotexceedthemaximumworkingpressureofthecylinder,eventemporarily.
j)Whenthecylindershavebeenlledcorrectlyandtheprocesscompleted,make
surethatthecylindersandtheequipmentareremovedfromsitepromptlyand
allisolationvalvesontheequipmentareclosedo󰀨.
k)Recoveredrefrigerantshallnotbechargedintoanotherrefrigerationsystem
unlessithasbeencleanedandchecked.
11.Labelling
• Equipmentshallbelabelledstatingthatithasbeende-commissionedandemptied
ofrefrigerant.
• Thelabelshallbedatedandsigned.
• Ensurethattherearelabelsontheequipmentstatingtheequipmentcontainsam-
mablerefrigerant.
12.Recovery
• Whenremovingrefrigerantfromasystem,eitherforservicingordecommissioning,
itisrecommendedgoodpracticethatallrefrigerantsareremovedsafely.
• Whentransferringrefrigerantintocylinders,ensurethatonlyappropriaterefrigerant
recoverycylindersareemployed.
• Ensurethatthecorrectnumberofcylindersforholdingthetotalsystemchargeare
available.
• Allcylinderstobeusedaredesignatedfortherecoveredrefrigerantandlabelled
forthatrefrigerant(i.e.specialcylindersfortherecoveryofrefrigerant).
• Cylindersshallbecompletewithpressurereliefvalveandassociatedshut-o󰀨
valvesingoodworkingorder.
• Emptyrecoverycylindersareevacuatedand,ifpossible,cooledbeforerecovery
occurs.
• Therecoveryequipmentshallbeingoodworkingorderwithasetofinstructions
concerningtheequipmentthatisathandandshallbesuitablefortherecoveryof
ammablerefrigerants.
• Inaddition,asetofcalibratedweighingscalesshallbeavailableandingoodwork-
ingorder.
• Hosesshallbecompletewithleak-freedisconnectcouplingsandingoodcondition.
• Beforeusingtherecoverymachine,checkthatitisinsatisfactoryworkingorder,
hasbeenproperlymaintainedandthatanyassociatedelectricalcomponentsare
sealedtopreventignitionintheeventofarefrigerantrelease.
Consultmanufacturerifindoubt.
• Therecoveredrefrigerantshallbereturnedtotherefrigerantsupplierinthecorrect
recoverycylinder,andtherelevantWasteTransferNotearranged.
• Donotmixrefrigerantsinrecoveryunitsandespeciallynotincylinders.
• Ifcompressorsorcompressoroilsaretoberemoved,ensurethattheyhavebeen
evacuatedtoanacceptableleveltomakecertainthatammablerefrigerantdoes
notremainwithinthelubricant.
• Theevacuationprocessshallbecarriedoutpriortoreturningthecompressorto
thesuppliers.
• Onlyelectricheatingtothecompressorbodyshallbeemployedtoacceleratethis
process.
• Whenoilisdrainedfromasystem,itshallbecarriedoutsafely.
Explanationofsymbolsdisplayedontheindoorunitoroutdoorunit.
WARNING
Thissymbolshowsthatthisequipmentusesaammable
refrigerant.Iftherefrigerantisleaked,togetherwithan
externalignitionsource,thereisapossibilityofignition.
CAUTION ThissymbolshowsthattheOperationManualshouldbe
readcarefully.
CAUTION
Thissymbolshowsthataservicepersonnelshouldbe
handlingthisequipmentwithreferencetotheInstallation
Manual.
CAUTION Thissymbolshowsthatthereisinformationincludedinthe
OperationManualand/orInstallationManual.
2. PRODUCT SPECIFICATION
2.1. Installation tools
WARNING
• ToinstallaunitthatusesR32refrigerant,usededicatedtoolsandpipingmaterialsthat
havebeenmanufacturedspecicallyforR32(R410A)use.Becausethepressureof
R32refrigerantisapproximately1.6timeshigherthanR22,failuretousededicated
pipingmaterialorimproperinstallationcancauseruptureorinjury.Furthermore,itcan
causeseriousaccidentssuchaswaterleakage,electricshock,orre.
• Donotuseavacuumpumporrefrigerantrecoverytoolswithaseriesmotor,sinceit
mayignite.
Tool name Contents of change
Gaugemanifold Pressureishighandcannotbemeasuredwithaconventional
(R22)gauge.Topreventerroneousmixingofotherrefriger-
ants,thediameterofeachporthasbeenchanged.
Itisrecommendedthegaugewithseals-0.1to5.3MPa
(-1to53bar)forhighpressure.-0.1to3.8MPa(-1to38bar)
forlowpressure.
Chargehose Toincreasepressureresistance,thehosematerialandbase
sizewerechanged.(R32/R410A)
Vacuumpump Aconventionalvacuumpumpcanbeusedbyinstallinga
vacuumpumpadapter.
(Useofavacuumpumpwithaseriesmotorisprohibited.)
Gasleakagedetector SpecialgasleakagedetectorforHFCrefrigerantR32/R410A.
Copper pipes
Itisnecessarytouseseamlesscopperpipesanditisdesirablethattheamountofresidual
oilislessthan40mg/10m.Donotusecopperpipeshavingacollapsed,deformedor
discoloredportion(especiallyontheinteriorsurface).Otherwise,theexpansionvalveor
capillarytubemaybecomeblockedwithcontaminants.
AsanairconditionerusingR32(R410A)incurspressurehigherthanwhenusingconven-
tionalrefrigerant,itisnecessarytochooseadequatematerials.


Product specificaties

Merk: Fujitsu
Categorie: Airco
Model: AOYG45KRTA

Heb je hulp nodig?

Als je hulp nodig hebt met Fujitsu AOYG45KRTA stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Airco Fujitsu

Handleiding Airco

Nieuwste handleidingen voor Airco