Da-Lite Da-Lift 10M 7371 Handleiding

Da-Lite Niet gecategoriseerd Da-Lift 10M 7371

Lees hieronder de πŸ“– handleiding in het Nederlandse voor Da-Lite Da-Lift 10M 7371 (8 pagina's) in de categorie Niet gecategoriseerd. Deze handleiding was nuttig voor 126 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/8
INSTRUCTION BOOK FOR
Da-Lift Projector Lift
10M, 15M, 15, 19, 19L
2
Important Safety Instructions Pre-Installation
When using your video equipment, basic safety precautions
should always be followed, including the following:
1. Read and understand all instructions before using.
2. Position the cord so that it will not be tripped over, pulled, or
contact hot surfaces.
3. If an extension cord is necessary, a cord with a current rating at
least equal to that of the appliance should be used. Cords rated
for less amperage than the appliance may overheat.
4. To reduce the risk of electric shock, do not disassemble this
appliance. Contact an authorized service dealer when repair
work is required. Incorrect reassembly can cause electric shock
when the appliance is used subsequently.
5. The use of an accessory attachment not recommended
by the manufacturer may cause a risk of ξ€Ÿire, electric shock,
or injury to persons.
Save These Instructions
This unit must be installed in accordance with the requirements
of the Local Building Codes, the Canadian Electrical Code (CEC),
CAN/CSA C22.1 and the National Electric Code (NEC) NFPA 70.
1. Carefully unpack Da-Lift projector lift.
2. Make sure to recheck measurements of projector lift location
before installation.
3
Suggested Methods Of Installation
1. Mounting Da-Lift Projector Lift between joists.
Install the joists at the proper height and width to ξ€Ÿit the Da-Lift
you are installing. See Figure 1.
NOTE: The Da-Lift must be installed on top of the joists.
Be sure to leave access from above for installation.
When the joists are properly installed, and secured in place, slide
the Da-Lift in position. Bolt the two brackets (1ξ€ž1/2” x 19”) to the
frame. Lower the unit onto the joists and secure in place.
Additional bracing may be required, based on construction.
NOTE: Da-Lift projector lift must be installed level!
2. Mounting Da-Lift Projector Lift using 1/2” diameter threaded rods.
Secure four 1/2” diameter threaded rods to the ceiling at the
dimensions shown. See Figure 2, β€œE” and β€œF”. Install the mounting
bracket (1ξ€ž1/2” x 19”) to each side of Da-Lift with 1/2” diameter bolts,
ξ€Ÿlat washers and nuts. Attach one nut on each rod and run the
nut up to the desired height.
Slide Da-Lift projector lift up with all (4) four threaded rods into
the mounting brackets. Install 1/2” nuts under the mounting
brackets. Adjust the frame to the proper height and level with
bottom nuts on the rod. Lock the mounting brackets in place
with the nuts on the top of each rod. Frame must be level and
solid. Additional bracing may be required, based on construction.
Model Lifting
Capacity
Width
A
Height
B
Depth
C
Height
D
DIm.
E
Dim.
F
Da-Lift 10M 40 lbs. 22ξ€žβ…β€ 4ξ€žΒ½β€ 24ξ€žβ…›β€15” 22” 14”
Da-Lift 15M 40 lbs. 22ξ€žβ…β€ 9ξ€žΒ½β€ 24ξ€žβ…›β€20” 22” 14”
Da-Lift 15 300 lbs. 30ξ€žΒΎβ€ 9ξ€žΒ½β€ 32ξ€žΒΌβ€ 16ξ€žΒΌβ€20” 34”
Da-Lift 19 300 lbs. 32ξ€žΒΎβ€ 24” 38” 13ξ€žΒ½β€ 34ξ€žΒΌβ€ 16ξ€žΒΌβ€
Da-Lift 19L 300 lbs. 42ξ€žΒΎβ€ 24” 48” 13ξ€žΒ½β€ 44ξ€žΒΌβ€ 16ξ€žΒΌβ€
Figure 1 Figure 2
A
C
B
D
EF


Product specificaties

Merk: Da-Lite
Categorie: Niet gecategoriseerd
Model: Da-Lift 10M 7371

Heb je hulp nodig?

Als je hulp nodig hebt met Da-Lite Da-Lift 10M 7371 stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Niet gecategoriseerd Da-Lite

Handleiding Niet gecategoriseerd

Nieuwste handleidingen voor Niet gecategoriseerd

Festo

Festo VPPI Handleiding

21 November 2024
Festo

Festo SFAB Handleiding

21 November 2024
Festo

Festo SFAH Handleiding

21 November 2024
Festo

Festo DRRD-12 Handleiding

21 November 2024
Festo

Festo SDE3 Handleiding

21 November 2024
Festo

Festo SFTE Handleiding

21 November 2024