CDA KA50SS Handleiding

CDA Spoelbak KA50SS

Lees hieronder de πŸ“– handleiding in het Nederlandse voor CDA KA50SS (4 pagina's) in de categorie Spoelbak. Deze handleiding was nuttig voor 54 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/4
Customer Care Department β€’ The Group Ltd. β€’ Harby Road β€’ Langar β€’ Nottinghamshire β€’ NG13 9HY
T : F : E : 01949 862 012 01949 862 003 customer.care@cda.eu www.cda.euW : www.cda.eu
Stainless Steel
Sinks
Installation
2
Installation
Before installation
Oξ€Ÿer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowls are compatible with the cabinets
themselves.
Confirm that with the sink in position:
β€’ξ€– ξ€–There is adequate space to install any taps or other required
accessories.
β€’ξ€– ξ€–There is adequate space to install the waste pipework and that any
necessary modification to internal shelves to accommodate the waste
(and trap) is acceptable.
β€’ξ€– ξ€–Access to any water stop-cock or other services will still be adequate
after the installation.
Installation
β€’ξ€– ξ€–Use the template included with the sink to mark out where the
worktop needs to be cut.
β€’ξ€– ξ€–After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
β€’ξ€– ξ€–ξ€–ξ€–Position the supplied gasket around the perimeter of the hole (Fig. 1).
β€’ξ€– ξ€–It is often easier to mount the taps,
waste-fitting and overflow onto the sink
prior to fitting the sink to the worktop.
β€’ξ€– Ensure that the external edge of the
sink is positioned on the gasket, to
create a barrier to the ingress of water
and other items between sink and
worktop.
Fig. 1
3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
β€’ξ€– ξ€–After positioning the sink on the
worktop, position the fixing brackets
as shown in Fig. 2, then tighten their
screws.
β€’ξ€– ξ€–Do not use a power tool to tighten
the screws; by using a hand tool
it is easier to ensure that they are
tightened just enough to clamp
down on the worktop and no more.
β€’ξ€– ξ€–After fixing, remove any excess gasket material with a suitable
cutter.
β€’ξ€– ξ€–We recommend a thin bead of silicone sealer is applied around the
perimeter as added protection against water ingress.
β€’ξ€– ξ€–The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
β€’ξ€– ξ€–To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
oξ€Ÿ the tap and wait several minutes to verify that the water doesn’t
drain away.
β€’ξ€– ξ€–Empty the sink.
After fitting, ensure that the enclosed β€œStainless Steel Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Fig. 2


Product specificaties

Merk: CDA
Categorie: Spoelbak
Model: KA50SS
Kleur van het product: Roestvrijstaal
Breedte: 860 mm
Diepte: 500 mm
Soort wastafel: Opbouwwasbak
Vorm gootsteen: Rechthoekig
Materiaal gootsteen: Roestvrijstaal
Aantal gootstenen: 1 kommen
Vorm eerste spoelbak: Rechthoekig
Eerste kom dimensies (WxL): 340 x 400 mm
Eerste kom diepte: 180 mm
Kraangat: Ja
Aanrecht: Ja
Kraan inclusief: Nee
Plaats aanrecht: Omkeerbaar

Heb je hulp nodig?

Als je hulp nodig hebt met CDA KA50SS stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Spoelbak CDA

Handleiding Spoelbak

Nieuwste handleidingen voor Spoelbak