Buderus Logano G115 WS Handleiding

Buderus Ketel & boiler Logano G115 WS

Lees hieronder de πŸ“– handleiding in het Nederlandse voor Buderus Logano G115 WS (60 pagina's) in de categorie Ketel & boiler. Deze handleiding was nuttig voor 13 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/60
For heating contractors
Please read carefully prior
to installation and servicing.
Caution!
Observe the safety instructions of this installation
and maintenance manual before placing the boiler
in operation.
Danger!
If installation, adjustment, modification, operation or
maintenance of the heating system is carried out by
an unqualified person, this may result in danger to
life and limb or property damage.
The directions of this installation and maintenance
manual must be followed precisely.
Contact a qualified service company or service pro-
vider if support or additional information is required.
Caution!
The operating manual is a component of the techni-
cal documentation and must be handed over to the
operator of the heating system.
Discuss the content of this manual with the owner
or operator of the heating system to ensure that
they are familiar with all information required for
operation of the heating system.
Installation and Service
Instructions
Low-temperature
oil boiler
6 720 804 872-00.1T
Logano G115 WS US/CA
6 720 804 872 - 2012/10 US/CA
Contents
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice
2
Contents
1 Safety Considerations and Symbol Descriptions 3
1.1 Regarding this Manual 3
1.2 Explanation of symbols 3
1.3 Observe the following Symbols 3
1.3.1 Installation Guidelines 4
1.3.2 Boiler Room Guidelines 4
1.4 Tools, Materials and Accessories 4
1.5 Disposal 4
2 Product description 5
2.1 Intended use 5
2.2 Certification and testing mark 5
2.3 Notes on installation and operation 5
2.4 Heating system water quality 5
2.5 Product description 6
2.6 Pack contents 7
2.7 Dimensions Specifications 8
2.7.1 Logano G115 WS dimensions 8
2.8 Conditions for operation 9
2.8.1 General operating conditions 9
2.8.2 Conditions for the boiler room and the environment 10
2.8.3 Combustion air supply conditions 10
2.8.4 Conditions, Fuel 10
2.8.5 Conditions power supply 11
2.8.6 Conditions for hydraulic system and water quality 11
3 Moving the boiler 12
3.1 Reducing boiler weight for transportation purposes 12
3.2 Lifting and carrying the boiler 13
3.3 Using transportation aids to transport the boiler 13
4 Installing the boiler 14
4.1 Wall clearances 14
4.2 Reversing boiler door 15
4.3 Mounting the adjustable feet (included with B-kit) 16
4.4 Positioning and leveling the boiler 16
5 Installing the boiler 17
5.1 Flue pipe installation 17
5.1.1 Chimney venting 17
5.2 Fitting the water connections 19
5.2.1 Fitting the B-kit 19
5.2.2 Installation of boiler drain (included in B-Kit) 20
5.2.3 Installing system components 20
5.3 Filling the heating system and checking for leaks 21
5.4 Mounting the burner 23
5.5 Connecting the fuel supply 23
5.6 Aquasmart installation 24
5.7 Blocked vent switch (required in Canada) 24
5.8 Electrical connections 24
5.8.1 Fitting the controls 25
5.8.2 Fitting temperature sensor assembly and burner cable 26
5.8.3 Connecting the power supply and additional components 27
5.8.4 Fitting cable ties 27
5.9 Fitting outer casing panels 27
6 Commissioning the heating system 28
6.1 Bringing the system up to operating pressure 28
6.2 Checking the safety valve 28
6.3 Checking position of heat exchanger baffles 29
6.4 Preparing the heating system for operation 29
6.5 Starting up the control and the burner 29
6.6 Notes on commissioning the burner 30
6.7 Raising flue gas temperature 30
6.7.1 Adjusting the position of heat exchanger baffles 31
6.7.2 Removing heat exchanger baffles 31
6.7.3 Removing the heat exchanger barrier plate 32
6.8 Manual reset high limit (STB) 32
6.9 Installing the burner door jacket 32
6.10 Commissioning log 33
7 Shutting down the heating system 34
7.1 Shutting down normally 34
7.2 Shutting down the heating system in an emergency 34
7.2.1 What to do in an emergency 34
8 Heating system servicing 35
8.1 Why is regular maintenance important? 35
8.2 Preparing the boiler for servicing 35
8.3 Cleaning the boiler 36
8.3.1 Cleaning the boiler with brushes 36
8.3.2 Wet cleaning (chemical cleaning) 37
8.4 Checking heating system operating pressure 37
8.5 Testing relief valve 38
8.6 Servicing and maintenance logs 39
9 Troubleshooting 42
10 Installation examples 43
11 Parts lists 45
12 Circuit diagrams 50
Index 56
1
Safety Considerations and Symbol Descriptions
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice 3
1 Safety Considerations and Symbol Descriptions
1.1 Regarding this Manual
This document contains important information regarding
safe and proper installation, operation and maintenance of
the boiler.
The high tech G115 WS boiler is designated as a hot
water heating boiler.
The Installation and Maintenance Instructions are directed
to the installing contractor who has professional knowl-
edge regarding boiler installation and maintenance.
1.2 Explanation of symbols
Signal words are used to indicate the seriousness of the
ensuing risk if measures for minimising damage are not
taken.
– Caution indicates that minor damage to property may
occur.
– Warning indicates that minor personal injury or severe
damage to property may occur.
– Danger means that severe personal injury may occur.
Very serious cases may result in death.
Notes contain important additional information.
Notes do not contain any warnings or information about
hazards or risks.
1.3 Observe the following Symbols
All applicable local, state, and national codes and regula-
tions must be observed for the installation of the boiler:
– The local building code requirements regarding place-
ment, combustion air and venting and chimney system
must be followed.
– Follow applicable electrical code requirements.
– Follow the local code and standards regarding safe
boiler operation.
Warnings are indicated by a warning triangle
and a grey background.
Notes are identified in the text by this symbol.
They are bounded by horizontal lines above
and below the text.
NOTICE
Use only original Buderus spare parts.
Buderus can not be held liable for damage
caused by non-Buderus parts.
NOTICE
The boiler installation must be performed by
a qualified installer in accordance with regu-
lations put forth in NFPA-31 Installation of
Oil-Burning Equipment. The installation must
comply with all local and national codes, reg-
ulations and authorities having jurisdiction re-
garding the installation of oil fired boilers.
For Canada refer to the guidelines of CSA/
CGA-B139 Installation Codes.


Product specificaties

Merk: Buderus
Categorie: Ketel & boiler
Model: Logano G115 WS

Heb je hulp nodig?

Als je hulp nodig hebt met Buderus Logano G115 WS stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Ketel & boiler Buderus

Handleiding Ketel & boiler

Nieuwste handleidingen voor Ketel & boiler