Biasi Inovia Combi 25C ERP Handleiding

Biasi Ketel & boiler Inovia Combi 25C ERP

Lees hieronder de 📖 handleiding in het Nederlandse voor Biasi Inovia Combi 25C ERP (92 pagina's) in de categorie Ketel & boiler. Deze handleiding was nuttig voor 4 personen en werd door 2 gebruikers gemiddeld met 4.5 sterren beoordeeld

Pagina 1/92
Wall hung, fanflue, roomsealed, high efficiency gas boiler
User manual and
Installation instructions
Inovia ERP
Models G.C. Appl. No.
Inovia 25C ERP 47-583-38
Inovia 30C ERP 47-583-39
Inovia 35C ERP 47-583-40
- 2 -
WARNING
Congratulations on your choice.
Inovia ERP are condensing high efciency sealed chamber fan ue gas boilers. They are
fully electronically controlled and have electronic ignition.
The materials they are made of and the control systems they are equipped with give you
safety, a high level of comfort and energy savings to allow you to get the greatest beneî‚¿t out
of independent heating.
Inovia ERP allow a higher efciency by reducing the ue gas temperature such that the
water vapour formed during the combustion is condensed out.
This allows a gain of useful heat that otherwise would be lost.
Biasi UK Ltd is a licensed member of the Benchmark Scheme which aims to improve the
standards of installation and commissioning of domestic heating and hot water systems in
the UK and to encourage regular servicing to optimise safety, efî‚¿ciency and performance.
Benchmark is managed and promoted by the Heating and Hot water Industry Council. For
more information visit www.centralheating.co.uk.
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of mechanical or generic origin (e.g.: Injuries or bruises).
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of electric origin (electrocution).
DANGER: The indications marked with this symbol must be observed to pre-
vent the risk of î‚¿re or explosion.
DANGER: The indications marked with this symbol must be observed to pre-
vent accidents of heat origin (burns).
ATTENTION: The indications marked with this symbol must be observed to
prevent malfunctioning and/or damage to materials of the appliance or other
objects.
ATTENTION: The indications marked with this symbol is important informa-
tion that must be carefully read.
- 3 -
WARNING
Remember that...
The manual must be read thoroughly, so that you will be able to use the boiler in a safe
and sensible way; must be carefully kept. It may be necessary for reference in the future.
The lighting up must be carried out by competent and responsible engineer.
The manufacturer
• disclaim all liability for any translations of the present manual from which incorrect inter-
pretation may occur;
• cannot be held responsible for non-observance of instructions contained in this manual
or for the consequences of any procedure not speciî‚¿cally described.
Guarantee conditions
• The guarantee registration form must be returned within 30 of purchase, failure to com-
ply will invalidate the guarantee.
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have signed
it to say that you have received a full and clear explanation of its operation. The installer is
legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England and Wales).
All installations must be notiî‚¿ed to Local Area Building Control either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certiî‚¿cate will then be
issued to the customer who should, on receipt, write the Notiî‚¿cation Number on the Bench-
mark Checklist.
This product should be serviced regularly to optimise its safety, efî‚¿ciency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist will be required in the event of any warranty.
Using the boiler...
Before lighting the boiler you are advised to have a Gas Safety Registered Engineer
check that the installation of the gas supply
• is gas-tight;
• is of the correct gauge for the ow to the boiler;
• is tted with all the safety and control devices required by the current Regulations.
Ensure that
• Check with the Installer that he has connected and terminated the pressure relief valve
in a manner which allows safe discharge. The manufacturers are not responsible for
damage caused by opening of the pressure relief valve and consequent escape of wa-
ter, if this is not connected and terminated.
• The installer has connected the condensate outlet to a suitable drain pipe.


Product specificaties

Merk: Biasi
Categorie: Ketel & boiler
Model: Inovia Combi 25C ERP

Heb je hulp nodig?

Als je hulp nodig hebt met Biasi Inovia Combi 25C ERP stel dan hieronder een vraag en andere gebruikers zullen je antwoorden




Handleiding Ketel & boiler Biasi

Handleiding Ketel & boiler

Nieuwste handleidingen voor Ketel & boiler